Roll up timesheet hours to parent records
Add parent table levels in Timesheets Pivot, expand the totals, and check which entries contributed to them.
Use Aggregation to total hours across related records. For example, if time entries link to Issues and each Issue has a parent Project, a project row can show the weekly hours logged on its issues.
Group hours by their parent records
- Open Timesheets → Pivot and choose the date range and user scope. Set Rows to Tables/Records, Columns to Week, and the measure to Hours.
- Open Aggregation. Start with the table that the time entries link to, then add its parent table. For example, keep Issues selected and add Projects. Use the actual parent relationship in your workspace.
- Read the weekly totals at the parent level. Use the arrow next to a parent row to see the related records behind its total. The parent row already includes the hours shown on those expanded child rows.
Check for hours outside the hierarchy
The parent totals include time linked to records that reach a parent in the selected hierarchy. If a total is lower than expected, check whether the time entry has a record link and whether that record has the expected parent. Switch Aggregation back to a single table and compare the hours for the same dates and users. You can also export individual entries to check the underlying time.
If Aggregation is absent or a table is missing, check the workspace’s linkable tables and their parent relationships.
Ask Mainbase AI
Ask about any feature in Mainbase. Find a setting, get step-by-step guidance, or troubleshoot a problem.
Open the AI assistantCopy a question to get started
- How do I create a Kanban view?
- How do I invite a teammate?
- Why is a record missing from this view?