Check whether a PDF drawing can supply BIM Compliance evidence

Check the drawing’s status in the data check and verify a replacement when the attached PDF is reference only.

Check the drawing before reviewing its evidence

  1. Open the assessment and go to Data check. If the check hasn’t run, verify the inputs and rule package, then select Evaluate readiness. Follow any prerequisites shown there before continuing.
  2. When Input evidence appears, find the drawing by its filename. For Eligible for deterministic drawing evidence, continue to 2D drawing evidence and check the actual evidence Mainbase found. When several eligible drawings are present, choose the intended file under PDF input.
  3. If the status is Reference only · not used as deterministic drawing evidence, the file can serve as a visual reference. It won’t appear among the eligible drawing inputs in 2D drawing evidence. For example, a scan of a paper plan can be readable on screen while lacking the vector geometry needed for extraction.

Check a replacement drawing

Ask for a vector PDF exported directly from the original drawing tool. Use the intended revision and verify the new filename before attaching it. If the assessment has already moved beyond source review, create a new draft assessment with the corrected source.

Run Evaluate readiness on the corrected assessment and check the new file under Input evidence. If it is eligible, review the evidence and any proposed facts for the cited sheets before confirming the data check.

Ask Mainbase AI

Ask about any feature in Mainbase. Find a setting, get step-by-step guidance, or troubleshoot a problem.

Open the AI assistant

Copy a question to get started

  • How do I create a Kanban view?
  • How do I invite a teammate?
  • Why is a record missing from this view?