Log work that crosses midnight
Set the start and end dates on a single time entry and check which period contains it.
Enter both dates in Calendar
- Open Timesheets → Calendar and go to the day the work began. Choose Me if User is visible, then select an empty slot to create a time entry.
- Enter a description. In Start, set the date and time you began. In End, set the following date and the time you finished. Use the date and time pickers for this step. Editing the clock time alone keeps the date already selected.
- Review the dates before selecting Create. For example, an entry from Tuesday at 10 p.m. to Wednesday at 2 a.m. spans four hours. Workspace rounding and duration rules can affect the saved duration.
Check the timesheet period
Reopen the entry in Calendar and verify both dates. If the work crossed a period boundary, the entry belongs to the period containing its start. For example, if your timesheet weeks start on Monday, work from Sunday at 10 p.m. to Monday at 2 a.m. belongs to the week ending Sunday.
Use the full Calendar entry form for overnight work. The editor in Focus uses the selected day for both times. If you’re checking the entry in a download, see how CSV dates and overnight rows work.
Ask Mainbase AI
Ask about any feature in Mainbase. Find a setting, get step-by-step guidance, or troubleshoot a problem.
Open the AI assistantCopy a question to get started
- How do I create a Kanban view?
- How do I invite a teammate?
- Why is a record missing from this view?