Pause and resume an Open Data table’s sync schedule
Temporarily suspend scheduled updates for one physical table, then restore its schedule and check the next successful run.
Pause a physical table’s sync schedule when you need to delay source updates. For example, if the publisher is correcting a dataset, pause that table’s schedule until the corrected resource is ready. You need permission to manage the connection and update the table.
Pause the intended table
- Open Open Data → Connected and select Open sync monitor. In workspace settings, find Sync monitor and select the source under Connections.
- Under Dataset sync tables, find the intended table by name. If the connection has several tables, confirm the name before changing the schedule.
- Select Pause schedule on that table and check for Schedule paused. Use View logs to check the latest recorded run, especially if a sync was already underway when you paused.
Restore the schedule and verify the next update
- When the source is ready again, return to the same table and select Resume schedule. Confirm Schedule active. Mainbase reuses the table’s existing schedule.
- After the next run, use View logs to confirm success, then check Last table sync and compare a record with the source. If you need to request an update sooner, Sync now queues runs for eligible active tables on the selected connection.
If the schedule is active but the table still has outdated records, diagnose the connected table.
Ask Mainbase AI
Ask about any feature in Mainbase. Find a setting, get step-by-step guidance, or troubleshoot a problem.
Open the AI assistantCopy a question to get started
- How do I create a Kanban view?
- How do I invite a teammate?
- Why is a record missing from this view?