Map fields before the first Open Data table sync

Set column labels, field types, and the record title when creating a physical synchronized table, then verify them after its first sync.

Set the field mapping while you create a physical synchronized table. For example, for an inspection dataset you might use the site name as the record title, keep the inspection count numeric, and give each column a label your team recognizes.

Set the labels, types, and title

  1. Open the dataset in Open Data, select the resource, and choose Configure connected table. In the table setup, choose Physical synchronized table when the resource offers it.
  2. Under Map fields, use Source Field to identify the publisher’s column. Edit Display Label to name that column in your workspace. For example, use Inspection count for inspection_count.
  3. Check the publisher’s values before changing Type. For example, use integer for a count or text for a code such as 00127 whose leading zeros are part of the value.
  4. Under Title Field (optional), choose a source field with a readable value, such as site_name. Leave Auto selected to let Mainbase choose. If you want to discard the mapping edits before creating the table, select Reset to defaults.

Verify the mapping after the first sync

Select Create connected table. Once the first sync succeeds, open a known record and compare its title and values with the source preview. Check a few rows before relying on the table, especially if you changed a field type. If records haven’t arrived, check the table’s sync log.

The title field supplies a readable name for the record. The sync uses its own record matching rules to determine which rows to update in later runs.

Ask Mainbase AI

Ask about any feature in Mainbase. Find a setting, get step-by-step guidance, or troubleshoot a problem.

Open the AI assistant

Copy a question to get started

  • How do I create a Kanban view?
  • How do I invite a teammate?
  • Why is a record missing from this view?