Compare actual and planned values in an Analytics Table

Use two columns from the same reporting period to calculate each row’s variance from plan.

Use an Analytics Table to see how far each team’s actual hours are above or below its plan. This example assumes the source table stores both numbers and has one report row per team.

Set up the two totals and their difference

  1. Select Configure widget on an Analytics Table. In Data → Columns, add a column called Actual hours. Set Source to Current, Aggregation to Sum, and Value field to the numeric field for actual hours. Keep Calculation mode on Raw value.
  2. Add a Planned hours column with the same settings, using the numeric field for planned hours. Keep Source on Current for both columns so they use the same reporting period.
  3. Select Add column and call it Hours above plan. Choose Delta under Source. Set Current value column to Actual hours and Previous value column to Planned hours. The second selector supplies the baseline for this calculation.
  4. Select Update Widget and compare the three results for one team. If the actual total is 120 hours and the plan is 100 hours, the variance is +20 hours. A negative result means fewer hours than planned.

To express the variance as a percentage, use Delta % with the same column selections. In the example, the result is +20%. The percentage stays empty when the planned value is missing or zero.

Compare two reporting periods in an Analytics Table

Ask Mainbase AI

Ask about any feature in Mainbase. Find a setting, get step-by-step guidance, or troubleshoot a problem.

Open the AI assistant

Copy a question to get started

  • How do I create a Kanban view?
  • How do I invite a teammate?
  • Why is a record missing from this view?