Add a milestone timeline to a quote

List project milestones in a quote and choose specific dates or a duration for each one.

Add a Timeline block to show how the work is scheduled. For example, use specific dates for a confirmed kickoff and a duration in weeks for a design phase whose start is still being scheduled.

Add the milestones

  1. Open the editable quote in Quotes & Contracts. On a blank line where you want the schedule, type /timeline and choose Timeline.

  2. Select Add Milestone. Enter a Milestone title and add a description if needed. Use the status selector to choose Pending, In Progress, or Completed.

  3. Under Schedule type, choose how to show the timing for that milestone.

    Choose Fill in
    Specific dates Start Date and, if the milestone spans more than one day, End Date.
    Duration Duration (weeks), such as 2 for two weeks.
  4. Repeat for the other milestones. Add them in the order you want them to appear in the quote.

Check the schedule before sending

Check the title, status, and timing of each milestone in the quote. Switching to Duration clears the milestone’s dates. Switching back to Specific dates clears its duration, so enter the dates again if needed.

When the draft is ready, review the signing copy before sending it.

Ask Mainbase AI

Ask about any feature in Mainbase. Find a setting, get step-by-step guidance, or troubleshoot a problem.

Open the AI assistant

Copy a question to get started

  • How do I create a Kanban view?
  • How do I invite a teammate?
  • Why is a record missing from this view?