Inspect BIM assessment results on the 3D model
Locate IFC evidence in the frozen model, switch between rule and overview colors, and isolate the affected elements.
Open the model evidence
- Open a completed BIM Compliance assessment. In Review results, select a result with IFC evidence and open Evidence. If the assessment includes both a drawing and a model, select 3D model.
- Expand Evidence references and check the IFC type and identifier for the element. The viewer uses the model version saved with the assessment. For example, identify the door referenced by a result before comparing it with nearby doors.
- Use Selected rule to view colors for the selected result’s rule or Overview to see mapped results across rules for this model. Read the legend to interpret each color and its count. The selection has its own color.
Isolate the targets and restore their surroundings
- Select Isolate targets when available. Look at the colored geometry and compare it with the result and its evidence references.
- Select Show context to restore the surrounding geometry. Switch back to Selected rule if you need to focus on one rule again.
If Mainbase reports that the IFC evidence isn’t bound to a frozen source, or that the 3D overlay couldn’t be loaded, check the evidence reference and the source file listed in the assessment before making a decision. For the rule and evidence behind the result, see Review and sign a BIM compliance assessment.
Inspect 3D BIM evidence with the keyboard
Ask Mainbase AI
Ask about any feature in Mainbase. Find a setting, get step-by-step guidance, or troubleshoot a problem.
Open the AI assistantCopy a question to get started
- How do I create a Kanban view?
- How do I invite a teammate?
- Why is a record missing from this view?