Read a table’s Open Data sync log
Check when a table sync ran, interpret its processed-record count, and verify an expected change against the source.
When a physical synchronized table looks out of date, check the run for that specific table. The connection’s activity chart summarizes several runs. The table log helps you follow up on one.
Find the run for your table
- Open Open Data → Connected and select Open sync monitor. Under Connections, select the connection for your table.
- Find the table by name in Dataset sync tables and select View logs. Under Recent sync logs, use Started to find the run that began after the publisher released the change.
- If the status is Running, check the same run again after it finishes. If it is Failed, read the error below the run details when one is shown. A Completed run can also contain reported errors, so check its messages before relying on the result.
Check the count and verify a record
Records processed combines records added, updated, and skipped during the run. An unchanged record can be skipped and still contribute to the total. For example, a run that checks 500 unchanged records can show 500 processed even if the table stayed the same.
Open the linked table and look for a record the publisher added or changed. Match it by a stable identifier, such as an inspection ID, then compare the relevant field with the source. If you can’t find it, check the active view’s filters and confirm that the field is included in the table’s mapping. If the table still looks stale, check the connection and verify the next refresh.
Ask Mainbase AI
Ask about any feature in Mainbase. Find a setting, get step-by-step guidance, or troubleshoot a problem.
Open the AI assistantCopy a question to get started
- How do I create a Kanban view?
- How do I invite a teammate?
- Why is a record missing from this view?