Move a time entry to another record
Correct the record linked to an existing time entry and verify where the hours appear.
Move a time entry when the logged hours are correct but belong to another record. For example, move a review entry from the parent project to the task you actually worked on.
- Open Timesheets → Calendar and select the entry to edit. Check the current Linked Record and the recorded duration.
- In Linked Record, search for and select the correct record. You need permission to edit both records, and the destination table must have a timesheet field.
- Select Update. Reopen the entry and verify the new link. If you also need to correct the description, times, or notes, make those changes after reopening the entry.
- Check that the time appears in the destination record’s Timesheet section and is no longer linked to the original record. The existing time entry keeps its duration.
If the entry opens in read-only mode, check the period and its approval status. If the destination is missing, ask an administrator to review the tables available for linking.
Ask Mainbase AI
Ask about any feature in Mainbase. Find a setting, get step-by-step guidance, or troubleshoot a problem.
Open the AI assistantCopy a question to get started
- How do I create a Kanban view?
- How do I invite a teammate?
- Why is a record missing from this view?