Roll an ERP Cashflow scenario forward after posting actuals

Advance the actuals cutoff, reconcile expected movements, and create a report snapshot for the new forecast window.

Use this workflow when a later period’s cash movements have been posted to the General Ledger and you want to forecast from that new cutoff. You need permission to edit the scenario and create a report snapshot.

  1. In ERP Cashflow, open the active scenario. If you need the previous report for reference, note its date and version in Report snapshot.
  2. Advance Actuals through to the last day you want to include in actuals. Check Forecast through and extend it if needed. The new forecast starts the day after the cutoff.
  3. Review the expected movements in the scenario. If a movement is now represented in posted actuals, select Remove on that assumption. For a movement that is still expected, update its Expected date to a date within the new forecast period. For example, after advancing the cutoff to May 31, remove a receipt posted on May 28 and move an unpaid receipt to its updated June date.
  4. Select Save scenario, then Create report snapshot. In the new report, use Posted GL evidence to check the posted receipt and Saved forecast assumptions to confirm that the unpaid receipt remains at its revised date.

The earlier snapshot remains available under Report snapshot. Open each snapshot separately to review a change in the cutoff. Side-by-side comparison requires matching reporting windows. If saving fails, check the date and amount rules.

Ask Mainbase AI

Ask about any feature in Mainbase. Find a setting, get step-by-step guidance, or troubleshoot a problem.

Open the AI assistant

Copy a question to get started

  • How do I create a Kanban view?
  • How do I invite a teammate?
  • Why is a record missing from this view?