Compare team productivity and occupation on a dashboard

Add Timesheet Productivity and Timesheet Occupation, use the same date range, and verify the hours behind each percentage.

Add both widgets and align their dates

  1. Open a dashboard you can manage. The workspace needs the Timesheets plugin, and you need permission to manage team timesheets.
  2. Select Add Widget, search the widget library for Timesheet Productivity, and add it. Repeat for Timesheet Occupation.
  3. On each card, choose the same range, such as Last week. Each widget has its own selector. This week and This month run through today. Last week and Last month cover the full previous period. The weekly ranges use the start day in Timesheets settings.

Read and verify the percentages

  • Productivity compares logged hours with expected hours. A member’s row shows their hours, expected hours, and entry count.
  • Occupation compares assigned budget hours with capacity. A member’s row shows their assigned hours, capacity, and assignment count.

For example, a team with 40 hours of capacity, 32 assigned hours, and 24 logged hours would have 80% occupation and 60% productivity for that period. Each widget shows a team total and up to eight people, ordered by the percentage on that widget.

To check a missing team member or an unexpected total, open Timesheets Reports for the same dates and look at the team or the individual. Check the source entries for productivity and the records’ assigned budget hours for occupation.

Ask Mainbase AI

Ask about any feature in Mainbase. Find a setting, get step-by-step guidance, or troubleshoot a problem.

Open the AI assistant

Copy a question to get started

  • How do I create a Kanban view?
  • How do I invite a teammate?
  • Why is a record missing from this view?