Set budget hours for planned work

Connect a numeric budget field to a Timesheets source and verify that assigned work counts toward occupation.

Use a budget hours field to include planned work in the Occupation report. You need permission to manage Timesheets settings. To create a new field, you also need permission to edit the table’s fields. You need access to manage team timesheets to verify the result in Reports.

Connect a budget hours field

  1. Open Settings → Workspace → Plugins → Timesheets → Linkable Tables. Find the table you use to assign work.
  2. Under Budget Hours Field (optional), choose an existing numeric field that stores hours or select + Create Budget Hours Field. The new field is named Budget Hours.
  3. Check that the source has an assignee field and that Show planned work on calendar is on with the intended date field selected. Wait for Settings saved.

Verify the budget in Reports

  1. Open a work record from the table. Give it an assignee with a capacity schedule, a date in the reporting period, and a positive budget, such as 4 hours. If the source excludes certain statuses, choose a record with an eligible status.
  2. Open Timesheets → Reports and select the same period. Under Planning Capacity, check Occupation for the person assigned to the record. If the amount is unexpected, compare the assigned budget, capacity, and logged hours for that period.

Ask Mainbase AI

Ask about any feature in Mainbase. Find a setting, get step-by-step guidance, or troubleshoot a problem.

Open the AI assistant

Copy a question to get started

  • How do I create a Kanban view?
  • How do I invite a teammate?
  • Why is a record missing from this view?