Compare planned and logged hours in Timesheets
Use the Reports view to compare assigned budget hours and saved time entries with available capacity.
Use Reports to see how much work is assigned for a period and how much time has been logged. You need access to manage team timesheets to open this view.
Compare both measures for the same period
- Open Timesheets → Reports. Choose All Team or select a person under User, then use the date navigator to set the period you want to review.
- Check Planning Capacity → Capacity for the expected hours in that scope. Work schedules, holidays, and approved leave can affect this number.
- Read Occupation for assigned budget hours divided by capacity. Read Avg. Productivity for logged hours divided by expected hours. For example, with 40 hours of capacity, 36 assigned hours give 90% occupation and 24 logged hours give 60% productivity.
- In the team view, find the person’s row under Occupation (by Team Member) and Productivity (by Team Member) to see their amounts and percentages.
Check an unexpected number
- For missing assigned hours, check the record’s assignee, planned dates, budget hours, and status. The linked table needs planned work configured and a numeric field selected under Budget Hours Field (optional).
- For missing logged hours, check that the completed entries fall within the selected period in the Timesheets calendar.
- If the capacity looks unexpected, check the workdays and capacity schedule for the same dates.
Review the team’s productivity distribution in Timesheets
Ask Mainbase AI
Ask about any feature in Mainbase. Find a setting, get step-by-step guidance, or troubleshoot a problem.
Open the AI assistantCopy a question to get started
- How do I create a Kanban view?
- How do I invite a teammate?
- Why is a record missing from this view?