Create a Projects table for time tracking

Set up a Projects table from Timesheets settings and verify that your team can link time entries to it.

If your workspace has no table with a Timesheet field, you can create one from Timesheets settings. You need permission to manage Timesheets and the workspace database.

Create the table and verify it

  1. Open Settings → Workspace → Plugins → Timesheets → Linkable Tables.
  2. Select Create Projects Table. The template includes fields for the project’s name, status, assignees, date range, and timesheets.
  3. After the creation message appears, check that Projects is listed as a source under Linkable Tables. If it’s missing, select Add Table Source, choose Projects and its Timesheet field, and wait for Settings saved.
  4. Add a project record and open a time entry in Timesheets. Search for the project under Linked Record to check that it’s available. Your teammates also need access to the project record to find it.

The default setup uses the project’s date range for planned work and excludes projects with the Archived status from suggestions. To adjust the source or reuse a table you already have, configure linkable tables.

Ask Mainbase AI

Ask about any feature in Mainbase. Find a setting, get step-by-step guidance, or troubleshoot a problem.

Open the AI assistant

Copy a question to get started

  • How do I create a Kanban view?
  • How do I invite a teammate?
  • Why is a record missing from this view?