Transit to Parks
Transit to Parks is a public ArcGIS Hub or REST source maintained by Transit2parks Lametro. It exposes 21 service-backed datasets with Queryable ArcGIS feature and map service layers with record previews through REST query endpoints for discovery, preview, and connection workflows.
Données publiques
À propos de ces données publiques
Transit to Parks est une source de données publique publiée par Transit2parks Lametro pour Worldwide, Global. Elle est classée dans Sources de donnees ouvertes et disponible sous OGL, avec une dernière mise à jour du catalogue le 18 mai 2026.
Cette entrée relie 21 sources, aperçus ou vues publiques pour évaluer les données avant de les ajouter à un espace de travail.
- Fournisseur:Transit2parks Lametro
- Catégorie:Sources de donnees ouvertes
- Géographie:Worldwide, Global
- Sources:21
T2P Survey Template
Mis à jour29 mai 2026This service contains point, line, and polygon geometries to allow summit attendees to make comments
readyT2P Production v4
Mis à jour29 mai 2026Update of production map with simplified symbology for metrolink layers, simplified popups, park labeling, and color adjustments
readyT2P ThreeTimeServiceArea
Mis à jour29 mai 2026Service Area sheds for Weekday noon and 5pm service, and Saturday noon service. Edited to add service area for Sunday middday service
readyT2P Parks of Interest
Mis à jour30 juill. 2025File generated from running the Extract Data solution.
readyL.A. County Park Needs Assessment Results
Mis à jour8 avr. 2025In March 2015, the Los Angeles County Board of Supervisors approved a motion to initiate the Countywide Comprehensive Parks and Recreation Needs Assessment. This represents an unprecedented effort to document existing parks and recreation facilities in cities and unincorporated communities and to use these data to determine the scope, scale, and location of park need in Los Angeles County. The Parks Needs Assessment will help local officials, park agencies, and residents understand the future steps that need to be taken to ensure all communities have adequate access to thriving parks.
readyL.A. County Park Needs Assessment Demographics
Mis à jour8 avr. 2025Park Need Study Area information, including the level of need, demographics, and health indicators. Park need levels were determined as part of our Comprehensive Countywide Park Needs Assessment, completed in 2016. All demographics are current as of June, 2020. Health indicators are from CalEnviroScreen's study from 2018. Demographics include: Population by Race Population by Age Median Household Income Household Size Educational Attainment Health indicators, taken from CalEnviroScreen, include: Asthma per 10,000 Cardiovascular Disease per 10,000 Low Birth Rate per 10,000 For data questions, please contact K.T. Williams at [email protected]
readyMetro Orange Line Stations
Mis à jour9 févr. 2023Metro Orange Line Stations
readyK Line Alignment
Mis à jour29 sept. 2022K Line alignment (from Metro_Rail_Metrolink_shp)
readyK Line Stations
Mis à jour25 mai 2022K Line Stations
readyMetro Rail and Busway (Existing)
Mis à jour26 janv. 2021readyMetro Busway Stations (Exisiting)
Mis à jour26 janv. 2021Based on 062019_Metro_Transit_Stations
readyLACMTA Line B/D Red/Purple 802/805 Stations
Mis à jour28 janv. 2020readyLACMTA Line C Green 803 Stations
Mis à jour28 janv. 2020readyLACMTA Line L Gold 804 Stations
Mis à jour28 janv. 2020readyLACMTA Line E Expo 806 Stations
Mis à jour28 janv. 2020readyLACMTA Line E Expo 806 Track
Mis à jour28 janv. 2020readyLACMTA Line A Blue 801 Track
Mis à jour28 janv. 2020readyLACMTA Line C Green 803 Track
Mis à jour28 janv. 2020readyLACMTA Line L Gold 804 Track
Mis à jour28 janv. 2020readyLACMTA Line B/D Red/Purple 802/805 Track
Mis à jour28 janv. 2020The file contains left and right alignments for Metro Red and Purple Lines. The alignments were created from coordinate points extracted from the Record Drawing. The Record Drawings included spiral curve, circle curve, and alignment data. The Record Drawings were created at various time from 11/1985 to 04/1999. Only tangent lines and circular curve data were used to create the alignments. Spiral data and crossover data were estimated and do not reflect the actual curvature of the tracks.
readyLACMTA Line A Blue 801 Stations
Mis à jour28 janv. 2020ready
Tous les points de terminaison chargés (21 au total)