Metropolitan Water Reclamation Dist of Greater Chicago
Metropolitan Water Reclamation Dist of Greater Chicago is a public ArcGIS Hub or REST source for Greater Chicago, Illinois maintained by Metropolitan Water Reclamation Dist of Greater Chicago. It exposes 12 service-backed datasets with Queryable ArcGIS FeatureServer and MapServer records exposed through layer endpoints for discovery, preview, and connection workflows.
Données publiques
À propos de ces données publiques
Metropolitan Water Reclamation Dist of Greater Chicago est une source de données publique publiée par Metropolitan Water Reclamation Dist of Greater Chicago pour Greater Chicago, Illinois, United States. Elle est classée dans Sources de donnees ouvertes et disponible sous OGL, avec une dernière mise à jour du catalogue le 18 mai 2026.
Cette entrée relie 12 sources, aperçus ou vues publiques pour évaluer les données avant de les ajouter à un espace de travail.
- Fournisseur:Metropolitan Water Reclamation Dist of Greater Chicago
- Catégorie:Sources de donnees ouvertes
- Géographie:Greater Chicago, Illinois, United States
- Sources:12
Flood Control and TARP Reservoirs
Mis à jour31 déc. 2025Flood Control and TARP Reservoir Locations
readyStormwater Planning Subwatersheds
Mis à jour31 déc. 2025Subwatershed boundaries used for volumetric analysis. Modified from subwatershed boundaries developed in the Detailed Watershed Plans.
readyStormwater Planning Watersheds
Mis à jour31 déc. 2025Watershed boundaries used for volumetric analysis. Modified from watershed boundaries developed in the Detailed Watershed Plans.
readyWatershed Volumetrics
Mis à jour31 déc. 2025This feature class aggregates data to the major Watershed scale. It provides the "Big Picture" view of regional flood resilience, comparing the total Baseline Storage Goal and Climate Resilience Goal against the entire inventory of MWRD and municipal assets. Key Field Dictionary: pln_watershed: Major Watershed Name (e.g., Cal-Sag Channel, North Branch). bsg_capgap_comb: Baseline Storage Capacity Gap. The total deficit in storage (ac-ft) for the current 100-year storm. unit_bsg_capgap_comb: Unmanaged Water Depth. The Capacity Gap normalized by watershed area (inches). CRG_capgap_comb: 2050 Climate Gap. The total volume of new storage required to meet the projected 2050 rainfall standards across the entire river basin.pct_imperv: Average Imperviousness. The area-weighted average impervious cover for the entire watershed, excluding open water.
readyStormwater Projects
Mis à jour31 déc. 2025This feature class tracks the location and status of stormwater infrastructure projects across MWRD service area in Cook County. It serves as a record of MWRD's investment in flood control and stormwater management. Projects includes Regional Flood Control (Phase I) projects, Local Stormwater Partnership (Phase II) projects, Green Infrastructure projects, and Voluntary Flood Prone Property Acquisition (FPPA). The dataset also contains structures and volumetric benefit information. Project data are updated quarterly or on an as-need basis. Attributes related to political units are updated annually using latest data retrieved from county, state and federal sources.
readySubwatershed Volumetrics
Mis à jour31 déc. 2025This layer summarizes storage needs and capacities based on physical drainage boundaries rather than political borders. It is the primary tool for watershed-based planning and identifying downstream impacts. It aggregates "Local" storage (detention ponds) and allocates "Regional" storage (TARP, Reservoirs) to the relevant drainage areas. Key Field Dictionary subwatershedcode / subwatershed: Name of the tributary or waterway branch. bsg_capgap_comb: Combined Storage Deficit. The remaining storage need (ac-ft) after accounting for ALL assets (Local Ponds + Regional Reservoirs + TARP). unit_bsg_capgap_comb: Unmanaged Water Depth. The Capacity Gap normalized by subwatershed area (inches). Indicates flood risk intensity due to the storage capacity gap. bsg_pctmet_comb: Resilience Score (%). The percentage of the Baseline Goal currently met by existing infrastructure. total_comb: Total System Capacity. The sum of all local basins, regional reservoirs, and TARP allocations.
readyMWRD Inundation
Mis à jour14 mai 2025MWRD 2, 5, 10, 25, 50, 100, and 500 year Inundation
readyMWRD Biological Survey Site Boundaries 2011
Mis à jour6 août 2019MWRD Biological Survey Site Boundaries 2011
readyMWRD Biological Survey Notable Locations
Mis à jour6 août 2019MWRD Biological Survey Notable Locations
readyWatershed Planning Areas
Mis à jour5 juin 2019Watershed Planning Areas The Watershed Planning Areas depicted in this feature layer and Appendix E of the Watershed Management Ordinance (WMO) are boundaries that determine the watershed specific release rate. Discharging stormwater across Watershed Planning Area lines is not allowed. The watershed specific release rates set for each Watershed Planning Area are for the storm event having a one percent probability of being equaled or exceeded in a given year (100-year storm event): Watershed Planning Area Gross Allowable Release Rate Calumet Sag Channel 0.30 cfs/acre North Branch 0.30 cfs/acre Poplar Creek 0.25 cfs/acre Little Calumet River 0.25 cfs/acre Upper Salt Creek 0.20 cfs/acre Lower Des Plaines 0.20 cfs/acre Watershed Management Permit applications accepted by MWRD prior to January 1, 2020, have the option to use a gross allowable release rate of 0.30 cfs/acre for the 100-year storm event. Watershed Management Permit applications accepted by the District on or after January 1, 2020 shall use the watershed specific release rates listed above.
readyYearly Fish Counts
Mis à jour5 juin 2019Aquatic biologists at the MWRD conduct fish monitoring periodically at locations through the MWRD service area, which includes the Chicago, Calumet, and Des Plaines River Systems. Electrofishing is one of the methods used to collect fish in both deep and shallow waterways. Seine nets have also been used in shallow streams. Fish are weighed, measured, and inspected for disease and other anomalies before being released back into the water unharmed. The data are analyzed to compare fish abundance, composition, and diversity throughout the waterways over time. As water quality improved since the 1970s, the abundance and diversity of fish have also increased. Throughout each decade since the 1970s, MWRD has collected increased numbers of fish at many of the long-term monitoring locations. These locations have also yielded more desirable game fish species over time. For more information on fish populations on the Chicago Area Waterway System please read A Fish Story.
readyMWRD Boundary
Mis à jour18 sept. 2018MWRD Boundaries. Please use this data for reference only.
ready
Tous les points de terminaison chargés (12 au total)