Wessex Water supply interruptions performance commitment data 2020-2025
What are performance commitments (PCs)? The water regulator Ofwat sets targets called performance commitments (PCs) to ensure companies deliver the best possible service for customers, society and the environment. Wessex Water had a range of PCs for the 2020-25 period. Each year we reported our results against these commitments, in our Annual Performance Reports. Where appropriate we’re publishing the data underpinning calculation of the PCs – you can find our other PC datasets on Marketplace or our Data Portal. Water supply interruptions PC Every day we treat and supply more than 273 million litres of drinking water to 1.4 million customers. Our supply grid allows us to move water around to meet demand across our region, ensuring our customers have a more reliable supply. Managing our network in this way, we endeavour to maintain continuous supplies to customers, however this is not always possible. Interruptions can occur for a variety of reasons such as planned maintenance work, a burst water main or third-party damage to our network. The water supply interruptions PC reports the number of minutes lost on average per customer, for interruptions of three hours or more. This measure acts as an indicator of the resilience of our water supply network and how well we can recover from an incident, thereby incentivising good stewardship and management of the network. Dataset details The dataset provides details of the supply interruptions contributing to our performance commitment, as per Ofwat’s detailed reporting guidance. In short, this means all planned and unplanned supply interruptions lasting three hours or more. This includes interruptions affecting non-household properties (e.g. businesses) and interruptions resulting from the actions of third parties. Properties that are unoccupied are still included in the property count for each interruption. Properties affected by multiple interruptions in a reporting year are included once for each interruption. For reasons of anonymisation, information in the location column is restricted to a village or town - a more exact location is not provided. The interruption start and stop data is determined from pressure monitoring at the water main, customer contacts or modelling. Field Information For InterruptionCategory there are two possible entries: ‘No water’ indicates a small incident involving one or a small number of properties. ‘Supply interruptions’ indicates a network interruption affecting multiple properties simultaneously. For InterruptionType, there are four possible entries: ‘Planned’ – An interruption that we schedule in advance for us to carry out specific work on the network e.g. maintenance or repair. ‘Planned/Overrun’ – An interruption that we schedule in advance and anticipate will last under three hours, but exceeds that. ‘Unplanned’ – An interruption that was not scheduled in advance e.g. an interruption resulting from a water main burst. ‘Third party’ – An interruption resulting from actions outside of Wessex Water’s control e.g. damage to our network by another utility company. For planned interruptions, there are seven possible entries for InterruptionReason: ‘Burst main’ – Rupture of a water main and subsequent work to repair it. ‘Mains rehabilitation’ – Work to improve the condition of existing water mains. ‘Mains replacement’ – Work to lay a new water main in the place of an existing one. ‘New mains’ – Work to lay a water main where there hasn't been one previously. ‘Not recorded’ ‘Planned leaks’ – Work to repair a leak. ‘Pressure Reducing Valve issue’ – Work to resolve a problem with a Pressure Reducing Valve (PRV) in our network. All interruptions assigned the type ‘Planned / overrun’ give a reason of ‘Planned / overrun’ in the InterruptionReason column. For unplanned interruptions, there are seven possible entries for InterruptionReason: ‘Air lock’ – Occasionally air can get trapped within the pipe network and this can result in the loss of supplies. ‘Booster failure’ – Failure of a booster pump that results in a failure to supply. ‘Burst main’ – Rupture of a water main and subsequent work to repair it. ‘Customer responsibility’ – Failure of customer owned pipework and / or internal plumbing ‘Maintenance / repair’ – Any other interruption which doesn’t fit into one of these categories. ‘Not recorded’ ‘Pressure Reducing Valve issue’ – Work to resolve a problem with a Pressure Reducing Valve (PRV) in our network. All interruptions assigned the type ‘Third party’ in InterruptionType give a reason of ‘Third party’ in the InterruptionReasoncolumn. How was this data collated? All supply interruptions information is collated in dedicated online corporate systems. To compile our annual reporting to Ofwat, we extract the details of the relevant interruptions into Excel. The published data set is an extract of this, with simplified location information. Data quality In some cases we cannot give an individual start time and end time as the event was made up of a number of interruption areas with different start and end times. These entries are recorded as “n/a”. The reason for each interruption is not always explicitly recorded in the Excel spreadsheet mentioned above. For the purpose of this published dataset the assumption has been made that any interruptions with no reason recorded were caused by a burst main. Publish frequency This dataset fully covers the reporting period for this performance commitment, 2020-2025. Supplementary information You may also be interested in Discover Water’s summary data from across the industry: https://www.discoverwater.co.uk/loss-of-supply
Updated Sep 30, 2026