ARCGIS_RESTSouthern Water Services LtdOGLStream -, United KingdomFeature Service

Wessex Water treatment works compliance performance commitment data 2025-2026

What are performance commitments (PCs)? The water regulator Ofwat sets targets called performance commitments (PCs) to ensure companies deliver the best possible service for customers, society and the environment. Wessex Water has a range of PCs for the 2025-2030 period. Each year we report our results against these commitments, in our Annual Performance Reports. Where appropriate we’re publishing the data underpinning calculation of the PCs – you can find our other PC datasets on Marketplace or our Data Portal. Treatment works compliance PC Every day we treat 472 million litres of sewage to make it safe to release back into the environment. For each of our water recycling centres (WRCs), the Environment Agency (EA) sets standards for the treated wastewater we discharge back into the environment. The standards are set out in a ‘permit’ for each site, which gives thresholds for various parameters (e.g. ammonia, suspended solids). Our water treatment centres (WTCs), which clean water ready to go to customers, also have permits specifying standards for any water we discharge back to the environment. On occasions the permit standards for the water returned to the environment from WRCs and WTCs are not met. This could be for a variety of reasons such as asset failure, or sometimes permit breaches can stem from third parties’ illegal discharges to our sewer network. The permit for each WRC and WTC details how many samples must be taken each year to monitor the quality of the discharge. The permit also sets out how many samples are allowed to exceed the permit limits – usually three per year. If the samples exceed the permit limits more times than allowed, the site is classed as failing i.e. failing to meet the permit conditions. For many parameters, permits also state an absolute threshold – if one sample exceeds this limit, the site is classed as failing. The treatment works compliance PC reports the percentage of our sites that are not failing their permit conditions. This is calculated as: [(Total no. of our WRC and WTC sites – no. of failing sites) / (total no. of our WTC and WTC sites)] x100 Note that the EA determines which sites are included in this metric based on site size – the very small WRCs are excluded. Compliance against discharge permits acts as an indicator of the health and resilience of our WRCs and WTCs and our impact on the environment. This PC incentivises us to maintain and improve these assets so that we can provide a consistent service to current and future generations and safeguard the environment in our region. Dataset details The dataset provides details of the failing sites contributing to our performance commitment in each reporting year. Field Information There are two possible entries for site type: ‘Water Recycling Centre’ ‘Water Treatment Centre’ Calendar year: Failures in the 2025 calendar year contribute to the 2025-26 reporting year, etc. There are three different entries for reason for site to be determined as failing the permit: ‘Look up table sample exceedances’ indicates that the site was classed as failing because samples exceeded the permit limits more times than allowed. This is known as ‘look up table sample exceedance’ because the number of ‘allowed’ exceedances is found in the ‘look up table’ section of the permit. ‘Sample exceedance’ indicates that the site was classed as failing because a single sample exceeded its absolute limit. ‘Failure to collect the correct number of UWWTD samples required by the permit’ indicates that the correct number of samples, as required by the permit, were not collected. How was this data collated? At the end of each calendar year the EA produces a list of sites that are classed as failing. The published dataset is an extract from this list, with relevant information added from our internal investigation work. Publish frequency This dataset will be updated annually for the reporting period for this performance commitment, 2025-2030. Please refer to our Open data schedule | Wessex Water for expected dates. Supplementary information For those keen to develop a deeper understanding of this dataset, the following additional reading is suggested: Sample data for influent and effluent at our Water Recycling Centres (WRCs)

Updated Sep 30, 2026

Loading map…