Spotsylvania Comprehensive Plan Update
Spotsylvania Comprehensive Plan Update is a public ArcGIS Hub or REST source for Spotsylvania County, Virginia maintained by Spotsylvania County GIS. It exposes 10 service-backed datasets with Queryable ArcGIS FeatureServer and MapServer records exposed through layer endpoints for discovery, preview, and connection workflows.
Public data
About this public data
Spotsylvania Comprehensive Plan Update is a public data source published by Spotsylvania County GIS for Spotsylvania County, Virginia, United States. It is listed in Open data sources and made available under OGL, with the latest catalogue update recorded on May 18, 2026.
This catalogue entry connects 10 public source references, preview assets, or live views so teams can evaluate the data before adding it to a workspace.
- Provider:Spotsylvania County GIS
- Category:Open data sources
- Geography:Spotsylvania County, Virginia, United States
- Sources:10
I95 Corridor ITS Clip
UpdatedJan 3, 2023I95 Corridor ITS Map layer included as element of the Thoroughfare Plan map appearing in the update to the Transportation Chapter of the Comprehensive Plan approved 07-28-2020 under CPA20-0001. Subsequently re-adopted on December 14, 2021 with the Comprehensive Plan under CPA17-0001.
readyI95 Study Area
UpdatedDec 16, 2022Spotsylvania Greenway System
readyCompPlan Survey fieldworker
UpdatedJul 29, 2022readyInterchange Project
UpdatedJun 28, 2022This data layer includes DRAFT revisions intended for proposed amendments to the Comprehensive Plan Thoroughfare Plan maps, depicting I-95 interchange projects specifically. This layer edits an existing approved one adding Exit 130 project. This draft layer if approved would amend the December 14, 2021 approved Comprehensive Plan.
readyRt 3 Operational Improvements
UpdatedJun 28, 2022This data layer includes DRAFT revisions intended for proposed amendments to the Comprehensive Plan Thoroughfare Plan maps, depicting Route 3 operational improvement projects specifically. This is an addition to the current Comprehensive Plan. This draft layer if approved would amend the December 14, 2021 approved Comprehensive Plan.
readyRoad Improvements
UpdatedJun 28, 2022This data layer includes DRAFT revisions intended for proposed amendments to the Comprehensive Plan Thoroughfare Plan maps, depicting Thoroughfare/Road improvement projects specifically. This layer edits and existing current one. This draft layer if approved would amend the December 14, 2021 approved Comprehensive Plan.
readyIntersection Improvement
UpdatedJun 28, 2022This data layer includes DRAFT revisions intended for proposed amendments to the Comprehensive Plan Thoroughfare Plan maps, depicting Intersection improvement projects specifically. This layer edits an existing approved one. This draft layer if approved would amend the December 14, 2021 approved Comprehensive Plan.
readyFour Mile Fork Operational Improvements
UpdatedJun 28, 2022This data layer includes DRAFT revisions intended for proposed amendments to the Comprehensive Plan Thoroughfare Plan maps, depicting Four Mile Fork Operational Improvement projects specifically. This is an addition to the currently approved plan. This draft layer if approved would amend the December 14, 2021 approved Comprehensive Plan.
readyRoad Corridors Amendment
UpdatedJun 28, 20222022 Draft Amendments to the County Road Based Bike/Ped Improvements Plan. This is a Comprehensive Plan map layer intended for Chapter 3A-Trailways Master Plan. The Road Based Bicycle and Pedestrian Improvements Plan is focused on implementation of sidewalks and shared use paths along major thoroughfares throughout the Primary Development Boundary and within the Lake Anna Mixed Use area along Route 208. Remaining areas outside of the Primary Development Boundary include bicycle and pedestrian friendly improvements in the form of shoulder improvements or shared road signage with exceptions for vital planned greenway trail linkages that appear as shared use paths. In addition to enhancing ability to use the corridors for bicycle and pedestrian uses, the improvements are meant to enhance safety byreducing potential conflicts with vehicles. In rural areas, shoulder imporvements also provide greater "room for error" for vehicular traffic and are more accomodating to large vehicles and agricultural machinery. A number of identified road based improvements are expected to be implemented via frontage improvements associated with development or planned road widening projects (See Thoroughfare Plan). A number of planned road based imporvements complement efforts to implement the County Greenways Plan. Those road based improvements have been reflected cognizant of the greenways plan.
readyGreenways Amendment
UpdatedJun 28, 2022Greenways
ready
All endpoints loaded (10 total)