Oregon Silver Jackets
Oregon Silver Jackets is a public ArcGIS Hub or REST source for Oregon_OEM maintained by Orsilverjackets Geo. It exposes 8 service-backed datasets with Queryable ArcGIS feature and map service layers with record previews through REST query endpoints for discovery, preview, and connection workflows.
Public data
About this public data
Oregon Silver Jackets is a public data source published by Orsilverjackets Geo for Oregon_OEM, United States. It is listed in Open data sources and made available under OGL, with the latest catalogue update recorded on May 18, 2026.
This catalogue entry connects 8 public source references, preview assets, or live views so teams can evaluate the data before adding it to a workspace.
- Provider:Orsilverjackets Geo
- Category:Open data sources
- Geography:Oregon_OEM, United States
- Sources:8
High Water Marks Collection form
UpdatedApr 23, 2026readyCrestGageControlPoint
UpdatedNov 1, 2023In support of the Portland District Floodplain Management System (FPMS), the U.S. Army Corps of Engineers has a network of approximately 233 stream crest gages located throughout the district in Oregon and Washington. These crest gages measure the relative crest height of flood events. In order to apply an absolute elevation to this data, the crest gage datum needs to be related to a geographic datum via land survey. This dataset includes the deliverable of setting monuments for the crest gages at 167 sites. These monuments were permanent in nature and should still exist.
ready1996 Flood HWM
UpdatedNov 1, 2023ready2012 Willamette HWM
UpdatedNov 1, 2023Middle Willamette Valley Flooding in January 2012 Flooding in the middle Willamette Valley occurred starting on January 17, 2012. Most streams crested on the 18th or 19th. The towns affected most significantly were Turner, OR and Scio, OR, which were flooded by Mill Creek and Thomas Creek, respectively. Salem, OR and Philomath, OR were flooded to a lesser extent by Mill Creek and Mary’s River, respectively. The storm was preceded by a number of days of lower snow elevations within the Willamette Valley (about 500 to 1000 ft), though accumulations were small – it did not snow at the Salem airport. Air temperatures rose from freezing to the mid-50s from the 16th to the 18th, and more than 2 inches of rain fell each day from January 17 to 19 at the Salem airport. See the file SalemWeatherJan2012.txt for detailed information. Flooding in Turner and Scio was the most severe of the event. The flood wave was fast for the Willamette basin, rising and falling in less than 48 hours. In response to the flooding, the State of Oregon Emergency Command Center was activated during the event. Additionally, the Corps of Engineers set outflows from USACE projects within the Willamette Valley to minimums. However, flooding was the result of local runoff so regulation served mainly to keep Willamette River flow as low as possible. Mary’s River set a record stage during this event; however, flood damage was limited due to the small amount of development within the floodplain. Mill Creek in Salem did come out of its banks on a limited basis around areas that are known to flood more often, namely where the creek runs along and crosses State Street several times. Field Trip Report One week after flood waters had receded, on Friday January 27, 2012, six members of the Hydrology, River and Coastal Engineering section of the USACE, Portland District, were split into three teams of two to set high water marks for the event. One team focused on maintaining USACE crest gages in Scio and Turner, and the other two teams set High Water Marks (HWMs) in Salem and Turner. Personnel: Lawrence Asuncion, Jeff Ballantine, EIT, Jim Burton, PE, Keith Duffy, PE, Sharon Schulz, PE, Geoffrey Walters, EIT
ready2008 Jan Nehelem Siletz Tilly HWM
UpdatedNov 1, 2023Hydrologic, Coastal and River Engineering Section Portland District US Army Corps of Engineers Date: 02-04 JAN 2008 Personnel: Pete Dickerson PE Chris Nygaard PE Matt Fraver EIT Day 1 Personnel from the Portland District Hydrologic, Coastal and River Engineering Section (EC-HY) reported to the vicinity of Vernonia, OR to collect high water marks on major tributaries of the Nehalem above Vernonia, including Beaver Creek and Rock Creek. The EC-HY team marked and surveyed four high water marks at three sites. Day 2 The EC-HY team met up with local officials to observe the tide gate and flooding damage near the mouth of the Nehalem River. After lunch, the team proceeded to Tillamook to survey tide gates and the adjacent levees at two sites. A notable levee breech was also surveyed. Day 3 The EC-HY team visited crest gages on the Siletz River. High water marks were found and surveyed relative to the crest gages on two of the three gages.
ready2007 Vernonia HWM
UpdatedOct 23, 2023Personnel from the Portland District Hydrologic, Coastal and River Engineering Section (EC-HY) continued with an emergency tasker from the Federal Emergency Management Agency (FEMA) to collect high water marks along the Nehalem River between Vernonia and Jewell sufficient to describe the water surface profile during the December 2007 flood event. The four members broke into two investigative teams of two people each and proceeded to locate, log and flag 26 high water marks along the Nehalem River. One team started from Jewell and worked upstream and the other team started from Nehalem and worked downstream. Communication was maintained with the two Portland District land survey crews who were collecting elevation data for the high water marks collected in Vernonia the previous day. Data Collected by Jim Crain, Jim Burton PE, Sharon Schulz, Matt Fraver EIT
ready2006 Tillamook HWM
UpdatedOct 23, 2023CORPS personnel visited 21 crest gages installed in Tillamook County on December 4-5, 2006 to collect high water marks following the flood events of early November, 2006. This network of gages was placed by the Portland District’s Flood Plain Management Services program and in support of the Tillamook Bay and Estuary General Investigation.
readyFPMS V2 DataColl
UpdatedOct 23, 2023Geospatial file used to collect data from the ENC-HY trimble Unit.
ready
All endpoints loaded (8 total)