Metropolitan Transportation Commission
Metropolitan Transportation Commission is a public ArcGIS Hub or REST source for Oakland maintained by MTC/ABAG. It exposes ArcGIS Hub datasets with Queryable ArcGIS FeatureServer and MapServer records exposed through layer endpoints for discovery, preview, and connection workflows.
Public data
About this public data
Metropolitan Transportation Commission is a public data source published by MTC/ABAG for Oakland, United States. It is listed in Open data sources and made available under OGL, with the latest catalogue update recorded on May 18, 2026.
This catalogue entry connects 1 public source reference, preview asset, or live view so teams can evaluate the data before adding it to a workspace.
- Provider:MTC/ABAG
- Category:Open data sources
- Geography:Oakland, United States
- Sources:1
San Francisco Bay Region Jurisdictions (Incorporated Places and Unincorporated County Lands) (clipped)
UpdatedNov 10, 2026The San Francisco Bay Region Jurisdictions feature set was developed by the Metropolitan Transportation Commission so tables containing values for both incorporated and unincorporated areas could be joined to a spatial feature set for mapping and analysis. County-level, 2025 TIGER/Line shapefiles were used to develop this feature set. Incorporated places (cities and towns) were erased from the county shapefile for the region. The remaining county areas (unincorporated lands) were then added to the incorporated places to produce a full, incorporated-unincorporated feature set for the region. For the final processing step, major water features were clipped from the jurisdiction feature set so only land areas remained.
readySan Francisco Bay Region Jurisdictions (Incorporated Places and Unincorporated County Lands)
UpdatedNov 10, 2026The San Francisco Bay Region Jurisdictions feature set was developed by the Metropolitan Transportation Commission so tables containing values for both incorporated and unincorporated areas could be joined to a spatial feature set for mapping and analysis. County-level, 2025 TIGER/Line shapefiles were used to develop this feature set. Incorporated places (cities and towns) were erased from the county shapefile for the region. The remaining county areas (unincorporated lands) were then added to the incorporated places to produce a full, incorporated-unincorporated feature set for the region. For the final processing step, major water features were clipped from the jurisdiction feature set so only land areas remained.
readyEquity Priority Communities Plan Bay Area 2050 Plus (ACS 2018 2022)
UpdatedOct 27, 2026This data set represents American Community Survey (ACS) 2018-2022 tract information related to Equity Priority Communities (EPCs) for Plan Bay Area 2050+. The Plan Bay Area 2050+ Equity Priority Communities incorporate EPCs identified with 2014-2018 ACS data, as well as EPCs identified with 2018-2022 ACS data into a single consolidated map of Plan Bay Area 2050+ Equity Priority Communities. The 2014-2018 vintage EPCs are not part of this data set. To perform analysis or visualization, you will need to use this layer along with the 2014-2018 layer which can be found by performing a keyword search. This data set was developed using American Community Survey 2018-2022 data for eight variables considered. This data set represents all tracts within the San Francisco Bay Region, and contains attributes for the eight Metropolitan Transportation Commission (MTC) Equity Priority Community tract-level variables for exploratory purposes. Equity Priority Communities are defined by MTC Resolution No. 4217-Equity Framework for Plan Bay Area 2040. As part of the development of the Equity Priority Communities - Plan Bay Area 2050+ features, the source Census tracts had portions that overlapped either the Pacific Ocean or San Francisco Bay removed. The result is this feature set has fewer Census tracts than the unclipped tract source data. Analysis producing the Plan Bay Area 2050+ Equity Priority Communities features (tract geography) are based on eight American Community Survey 2018-2022 tract-level variables: People of Color (72% threshold) Low-Income (less than 200% of Federal poverty level, 24% threshold) Limited English Proficiency (11% threshold) Seniors 75 Years and Over (10% threshold) Zero-Vehicle Households (16% threshold) Single-Parent Family (16% threshold) People with a Disability (12% threshold) Severely Rent-Burdened Households (14% threshold) If a tract exceeds both threshold values for Low-Income and People of Color shares OR exceeds the threshold value for Low-Income AND also exceeds the threshold values for three or more variables, it is a EPC. Detailed documentation on the production of this feature set can be found in the MTC Equity Priority Communities project documentation.
readyEquity Priority Communities Plan Bay Area 2050 Plus (ACS 2014 2018)
UpdatedOct 27, 2026This data set represents American Community Survey (ACS) 2014-2018 tract information related to Equity Priority Communities (EPCs) for Plan Bay Area 2050+. The Plan Bay Area 2050+ Equity Priority Communities incorporate EPCs identified with 2014-2018 ACS data, as well as EPCs identified with 2018-2022 ACS data into a single consolidated map of Plan Bay Area 2050+ Equity Priority Communities. The 2018-2022 vintage EPCs are not part of this data set. To perform analysis or visualization, you will need to use this layer along with the 2018-2022 layer which can be found by performing a keyword search. This data set was developed using American Community Survey 2014-2018 data for eight variables considered. This data set represents all tracts within the San Francisco Bay Region, and contains attributes for the eight Metropolitan Transportation Commission (MTC) Equity Priority Communities tract-level variables for exploratory purposes. Equity Priority Communities are defined by MTC Resolution No. 4217-Equity Framework for Plan Bay Area 2040. As part of the development of the Equity Priority Communities - Plan Bay Area 2050+ features, the source Census tracts had portions that overlapped either the Pacific Ocean or San Francisco Bay removed. The result is this feature set has fewer Census tracts than the unclipped tract source data. Plan Bay Area 2050+ Equity Priority Communities (tract geography) are based on eight ACS 2014-2018 (ACS 2018) tract-level variables: People of Color (70% threshold) Low-Income (less than 200% of Federal poverty level, 28% threshold) Level of English Proficiency (12% threshold) Seniors 75 Years and Over (8% threshold) Zero-Vehicle Households (15% threshold) Single-Parent Households (18% threshold) People with a Disability (12% threshold) Rent-Burdened Households (14% threshold) If a tract exceeds both threshold values for Low-Income and People of Color shares OR exceeds the threshold value for Low-Income AND also exceeds the threshold values for three or more variables, it is a EPC. Detailed documentation on the production of this feature set can be found in the MTC Equity Priority Communities project documentation.
readyHCD Annual Progress Report Entitlements (2026)
UpdatedOct 9, 2026This dataset contains entitled housing projects collected by the California Department of Housing and Community Development (HCD) as part of the Annual Progress Report (APR) process required under the Regional Housing Needs Allocation (RHNA) program. It spans two RHNA planning cycles — Cycle 5 (2015–2023) and Cycle 6 (2023–2031) — and is one of three phase-specific datasets derived from the APR; see also Permits and Certificates (linked below). Coverage begins with the 2018 reporting year, when HCD introduced the standardized APR form used to collect entitlement, permit, and certificate of occupancy data — a few years into Cycle 5. Records prior to 2018 have not been made available by HCD and are not part of this dataset. The dataset has been de-duplicated: only records where the APR reporting year matches the entitlement issue year are included. Because a project is re-submitted to HCD as it advances through each stage of development, the same project can appear across multiple APR years. Filtering to the entitlement-year records reduces this overcounting so that unit summaries are as accurate as possible given current data limitations. Income category columns. The acutely_low_income_total, extremely_low_income_total, vlow_income_total, low_income_total, and mod_income_total columns combine deed-restricted and non-deed-restricted units. They are mutually exclusive, so together with above moderate-income units they sum to the total units for this phase. Before 2025, extremely low-income units were reported within the very low-income category and in the EXTR_LOW_INCOME_UNITS field; MTC moves those units into the extremely low-income total so they are not counted twice. The rhna_vlow_income_total column is for RHNA progress reporting only. It combines acutely low-, extremely low-, and very low-income units, because ABAG's Cycle 5 and Cycle 6 RHNA allocations have no separate targets for the two lower categories, and it matches the very low-income figure on HCD's 6th Cycle RHNA Progress page. It overlaps the three columns it combines and should never be added to them or used when summing total units. Data were downloaded on October 6th, 2026, and represent a snapshot of the APR source dataset, enriched by MTC-ABAG with standardized parcel identifiers, address validation, and additional attributes to support regional housing and land use work. Each located project is represented by a point at the centroid of the parcel it was matched to, using standardized APN and, as a fallback, validated address information. Approximately 94% of projects are successfully located; the remainder cannot be confidently matched to a single parcel — typically due to missing, partial, or not-yet-assigned APNs and addresses at the entitlement stage. Projects that could not be geocoded are retained in this dataset without geometry. These records carry full attributes and unit counts and must be included when computing unit totals; any aggregation should be run against the complete record set, not only the mapped features. Reference attributes in this dataset — environmental, policy, and other overlay flags such as sea level rise exposure — were assigned at the parcel level, based on the share of the matched parcel falling within each reference geography, not from the centroid point. Because the point is a parcel centroid, a project may plot visually outside a reference polygon it is nonetheless flagged as intersecting. When comparing points against reference layers, treat the attribute flags as authoritative rather than the point's plotted position. Jurisdictions submit updated APRs to HCD annually on April 1 and may submit corrections at any time throughout the year. As a result, discrepancies in reported unit counts may exist between this dataset and the data available on HCD's website. For the most up-to-date data, refer to: https://www.hcd.ca.gov/planning-and-community-development/housing-element-implementation-and-apr-dashboard Related datasets Certificates: https://mtc.maps.arcgis.com/home/item.html?id=0745e23cc3cd450596518487177e0f8a Permits: https://mtc.maps.arcgis.com/home/item.html?id=d230364bb4854af39c2de146c0ee3f66
readyHCD Annual Progress Report Permits (2026)
UpdatedOct 9, 2026This dataset contains housing projects issued building permits, collected by the California Department of Housing and Community Development (HCD) as part of the Annual Progress Report (APR) process required under the Regional Housing Needs Allocation (RHNA) program. It spans two RHNA planning cycles — Cycle 5 (2015–2023) and Cycle 6 (2023–2031) — and is one of three phase-specific datasets derived from the APR; see also Entitlements and Certificates (linked below). Coverage begins with the 2018 reporting year, when HCD introduced the standardized APR form used to collect entitlement, permit, and certificate of occupancy data — a few years into Cycle 5. Records prior to 2018 have not been made available by HCD and are not part of this dataset. The dataset has been de-duplicated: only records where the APR reporting year matches the building permit issue year are included. Because a project is re-submitted to HCD as it advances through each stage of development, the same project can appear across multiple APR years. Filtering to the permit-year records reduces this overcounting so that unit summaries are as accurate as possible given current data limitations. Income category columns. The bp_acutely_low_income_total, bp_extremely_low_income_total, bp_vlow_income_total, bp_low_income_total, and bp_mod_income_total columns combine deed-restricted and non-deed-restricted units. They are mutually exclusive, so together with above moderate-income units they sum to the total units for this phase. Before 2025, extremely low-income units were reported within the very low-income category and in the EXTR_LOW_INCOME_UNITS field; MTC moves those units into the extremely low-income total so they are not counted twice. The bp_rhna_vlow_income_total column is for RHNA progress reporting only. It combines acutely low-, extremely low-, and very low-income units, because ABAG's Cycle 5 and Cycle 6 RHNA allocations have no separate targets for the two lower categories, and it matches the very low-income figure on HCD's 6th Cycle RHNA Progress page. It overlaps the three columns it combines and should never be added to them or used when summing total units. Data were downloaded on October 6th, 2026, and represent a snapshot of the APR source dataset, enriched by MTC-ABAG with standardized parcel identifiers, address validation, and additional attributes to support regional housing and land use work. Each located project is represented by a point at the centroid of the parcel it was matched to, using standardized APN and, as a fallback, validated address information. Approximately 94% of projects are successfully located; the remainder cannot be confidently matched to a single parcel — typically due to missing, partial, or inconsistent APNs and addresses, or parcel lineage changes over time. Projects that could not be geocoded are retained in this dataset without geometry. These records carry full attributes and unit counts and must be included when computing unit totals; any aggregation should be run against the complete record set, not only the mapped features. Reference attributes in this dataset — environmental, policy, and other overlay flags such as sea level rise exposure — were assigned at the parcel level, based on the share of the matched parcel falling within each reference geography, not from the centroid point. Because the point is a parcel centroid, a project may plot visually outside a reference polygon it is nonetheless flagged as intersecting. When comparing points against reference layers, treat the attribute flags as authoritative rather than the point's plotted position. Jurisdictions submit updated APRs to HCD annually on April 1 and may submit corrections at any time throughout the year. As a result, discrepancies in reported unit counts may exist between this dataset and the data available on HCD's website. For the most up-to-date data, refer to: https://www.hcd.ca.gov/planning-and-community-development/housing-element-implementation-and-apr-dashboard Related datasets Certificates: https://mtc.maps.arcgis.com/home/item.html?id=0745e23cc3cd450596518487177e0f8a Entitlements: https://mtc.maps.arcgis.com/home/item.html?id=ef51003c5412486e9df3292ef305751a
readyHCD Annual Progress Report Certificates (2026)
UpdatedOct 9, 2026This dataset contains housing projects that received a certificate of occupancy or other form of readiness, collected by the California Department of Housing and Community Development (HCD) as part of the Annual Progress Report (APR) process required under the Regional Housing Needs Allocation (RHNA) program. It spans two RHNA planning cycles — Cycle 5 (2015–2023) and Cycle 6 (2023–2031) — and is one of three phase-specific datasets derived from the APR; see also Entitlements and Permits (linked below). Coverage begins with the 2018 reporting year, when HCD introduced the standardized APR form used to collect entitlement, permit, and certificate of occupancy data — a few years into Cycle 5. Records prior to 2018 have not been made available by HCD and are not part of this dataset. The dataset has been de-duplicated: only records where the APR reporting year matches the certificate of occupancy issue year are included. Because a project is re-submitted to HCD as it advances through each stage of development, the same project can appear across multiple APR years. Filtering to the certificate-year records reduces this overcounting so that unit summaries are as accurate as possible given current data limitations. Income category columns. The co_acutely_low_income_total, co_extremely_low_income_total, co_vlow_income_total, co_low_income_total, and co_mod_income_total columns combine deed-restricted and non-deed-restricted units. They are mutually exclusive, so together with above moderate-income units they sum to the total units for this phase. Before 2025, extremely low-income units were reported within the very low-income category and in the EXTR_LOW_INCOME_UNITS field; MTC moves those units into the extremely low-income total so they are not counted twice. The co_rhna_vlow_income_total column is for RHNA progress reporting only. It combines acutely low-, extremely low-, and very low-income units, because ABAG's Cycle 5 and Cycle 6 RHNA allocations have no separate targets for the two lower categories, and it matches the very low-income figure on HCD's 6th Cycle RHNA Progress page. It overlaps the three columns it combines and should never be added to them or used when summing total units. Data were downloaded on October 6th, 2026, and represent a snapshot of the APR source dataset, enriched by MTC-ABAG with standardized parcel identifiers, address validation, and additional attributes to support regional housing and land use work. Each located project is represented by a point at the centroid of the parcel it was matched to, using standardized APN and, as a fallback, validated address information. Approximately 94% of projects are successfully located; the remainder cannot be confidently matched to a single parcel — typically due to missing, partial, or inconsistent APNs and addresses, or parcel lineage changes over time. Projects that could not be geocoded are retained in this dataset without geometry. These records carry full attributes and unit counts and must be included when computing unit totals; any aggregation should be run against the complete record set, not only the mapped features. Reference attributes in this dataset — environmental, policy, and other overlay flags such as sea level rise exposure — were assigned at the parcel level, based on the share of the matched parcel falling within each reference geography, not from the centroid point. Because the point is a parcel centroid, a project may plot visually outside a reference polygon it is nonetheless flagged as intersecting. When comparing points against reference layers, treat the attribute flags as authoritative rather than the point's plotted position. Jurisdictions submit updated APRs to HCD annually on April 1 and may submit corrections at any time throughout the year. As a result, discrepancies in reported unit counts may exist between this dataset and the data available on HCD's website. For the most up-to-date data, refer to: https://www.hcd.ca.gov/planning-and-community-development/housing-element-implementation-and-apr-dashboard Related datasets Entitlements: https://mtc.maps.arcgis.com/home/item.html?id=ef51003c5412486e9df3292ef305751a Permits: https://mtc.maps.arcgis.com/home/item.html?id=d230364bb4854af39c2de146c0ee3f66
readyTransit Priority Areas (2026)
UpdatedSep 16, 2026This features in this service provide Transit Priority Areas for the San Francisco Bay Region. This Transit Priority Areas release was extracted from data developed by the California Department of Transportation (Caltrans) as part of its High Quality Transit mapping. For the Transit Priority Areas, Metropolitan Transportation Commission staff extracted the regional feature set from the statewide, High Quality Transit Areas data produced by Caltrans. The features were selected for extraction by using a query where the High Quality Transit Area type was a major bus stop, major rail stop, major Bus Rapid Transit stop, or major ferry stop. The full, High Quality Transit Areas feature set for the San Francisco Bay Region can be found at https://mtc.maps.arcgis.com/home/item.html?id=769f59ddb61449d9ab623083476e3186. Information on how Caltrans developed the source data, and to access the statewide data sets, please visit the High Quality Transit Areas Analysis Open Data Portal.
ready2027 Transportation Improvement Program Projects Polygon
UpdatedSep 15, 2026Polygon feature from the full set of projects that are part of the Metropolitan Transportation Commission's 2027 Transportation Improvement Program (TIP). The TIP lists the near-term transportation projects, programs, and investment priorities of the San Francisco Bay Region’s surface transportation system that have a federal interest — meaning projects or programs for which federal funds or actions by federal agencies are anticipated — along with locally and state-funded projects that are regionally significant. A regionally significant project, generally large scale, changes travel patterns over a relatively large geographic area. The TIP signifies the start of implementation of the programs and policies approved in the region’s long-range transportation plan. It does this by identifying specific projects over a four-year time-frame that will help move the region toward its transportation vision. Locally funded transit operations, roadway maintenance projects, planning efforts and minor sidewalk or intersection improvements are generally not included in the TIP. Other 2027 TIP projects are included in: 2027 Transportation Improvement Program Projects - Point 2027 Transportation Improvement Program Projects - Line
ready2027 Transportation Improvement Program Projects Line
UpdatedSep 15, 2026Linear features from the full set of projects that are part of the Metropolitan Transportation Commission's 2027 Transportation Improvement Program (TIP). The TIP lists the near-term transportation projects, programs, and investment priorities of the San Francisco Bay Region’s surface transportation system that have a federal interest — meaning projects or programs for which federal funds or actions by federal agencies are anticipated — along with locally and state-funded projects that are regionally significant. A regionally significant project, generally large scale, changes travel patterns over a relatively large geographic area. The TIP signifies the start of the implementation of the programs and policies approved in the region's long-range transportation plan. It does this by identifying specific projects over a four-year time-frame that will help move the region toward its transportation vision. Locally funded transit operations, roadway maintenance projects, planning efforts and minor sidewalk or intersection improvements are generally not included in the TIP. Other 2027 TIP projects are included in: 2027 Transportation Improvement Program Projects - Point 2027 Transportation Improvement Program Projects - Polygon
ready2027 Transportation Improvement Program Projects Point
UpdatedSep 15, 2026Point features from the full set of projects that are part of the Metropolitan Transportation Commission's 2027 Transportation Improvement Program (TIP). The TIP lists the near-term transportation projects, programs, and investment priorities of the San Francisco Bay Region’s surface transportation system that have a federal interest — meaning projects or programs for which federal funds or actions by federal agencies are anticipated — along with locally and state-funded projects that are regionally significant. A regionally significant project, generally large scale, changes travel patterns over a relatively large geographic area. The TIP signifies the start of the implementation of the programs and policies approved in the region's long-range transportation plan. It does this by identifying specific projects over a four-year time-frame that will help move the region toward its transportation vision. Locally funded transit operations, roadway maintenance projects, planning efforts and minor sidewalk or intersection improvements are generally not included in the TIP. Other 2027 TIP projects are included in: 2027 Transportation Improvement Program Projects - Line 2027 Transportation Improvement Program Projects - Polygon
readyLyft Bike Bikeshare Stations
UpdatedSep 8, 2026Launched in 2017, Lyft Bike (formerly Bay Wheels) is the San Francisco Bay Region's bike share program with over 6,000 bicycles – both pedal-powered and pedal-assist electric bikes – at more than 600 stations in San Jose, San Francisco, Daly City, Oakland, Berkeley, and Emeryville. An easy-to-use bike share system helps the region to achieve the Plan Bay Area 2050 statutory target to reduce greenhouse gas emissions, as well as the goal of reducing vehicle miles traveled. Bike share also serves as an important first-last mile connection to regional transit. Lyft Bike bikeshare is a partnership between the Metropolitan Transportation Commission (MTC), the local governments, and Lyft. In 2023, the MTC committed $20 million to expand the Lyft Bike bikeshare system. This investment reduced the price of an annual membership, added 55 stations to the network, and added more than 2,000 e-bikes to the fleet. Information on using the Lyft Bike bikeshare stations/bikes can be found at https://lyftbikes.com/. More information about bike share efforts at MTC can be found on the Lyft Bike Bikeshare Program page.
readySan Francisco Bay Region Major Transit Stops
UpdatedSep 3, 2026This feature set contains major transit stops in the nine-county San Francisco Bay Region as defined in the California Public Resources Code, Section 21064.3: An existing rail transit station, a ferry terminal served by either a bus or rail transit service, or the intersection of two or more major bus routes with a frequency of service interval of 20 minutes or less during the morning and afternoon peak commute periods. The data set is a subset of the San Francisco Bay Region High Quality Transit Stops feature set. Source data was updated by the California Department of Transportation (Caltrans) in August 2026. Major Stops were derived for this feature set using the query hqta_type "hq_corridor_bus" to return all major transit stops for the San Francisco Bay Region. The hqta_types in this feature set are major_stop_brt, major_stop_bus, major_stop_ferry, and major_stop_rail. For information on how Caltrans developed the source data, and to access their transit data, please visit the High Quality Transit Areas Analysis Open Data Portal.
readySan Francisco Bay Region High Quality Transit Stops
UpdatedSep 3, 2026This feature set provides August 20, 2026 estimated stops along High Quality Transit Corridors, plus major transit stops for bus rapid transit, ferry, and rail modes as described in Public Resources Code 21155, 21064.3, and 21060.2. Existing stops are calculated from General Transit Feed Specification (GTFS) data. Planned major transit stops are from Metropolitan Planning Organization-provided Regional Transportation Plans. See https://github.com/cal-itp/data-analyses/tree/main/high_quality_transit_areas for additional details. Caltrans used GTFS schedule trips, stop_times, shapes, and stops to estimate whether corridor segments have scheduled headways of 20 minutes or less. For information on how Caltrans developed the source data, and to access their data set, please visit the High Quality Transit Areas Analysis Open Data Portal.
readySan Francisco Bay Region High Quality Transit Areas
UpdatedSep 3, 2026These features represent the August 20, 2026 High Quality Transit Areas (HQTA), developed by the California Department of Transportation (Caltrans). The features in this data set, representing the San Francisco Bay Region, were on extracted by Metropolitan Transportation Commission staff from the statewide, source data produced by Caltrans. Per statute, HQTA are defined as the half-mile surrounding high quality transit corridors and major transit stops. The Caltrans HQTA (polygon) dataset already incorporates this half-mile buffer. Using the HQTA dataset, it is possible to determine if an area qualifies because it is a high quality transit corridor, major transit stop, or both. This is useful for certain kinds of analyses, since some statutes and programs only reference major transit stops and don’t include high quality transit corridors. For information on how Caltrans developed the source data, and to access the complete data set, please visit the High Quality Transit Areas Analysis Open Data Portal.
readyTransit Service Areas (2023)
UpdatedAug 28, 2026Transit Service Areas for the San Francisco Bay Region. These areas represent 1/2 mile buffers from existing transit stops. Existing transit stop data was downloaded from the 511 SF Bay 511 General Transit Feed Specification API in May 2023. The initial data set was then simplified by dissolving buffer polygon boundaries by the values found in the agency_id, agency_nm, and route_type columns.
readySenate Bill 79 Transit Oriented Development Zones
UpdatedJul 1, 2026This feature service provides transit-oriented development zones in the San Francisco Bay Region that are applicable to California Senate Bill 79 (SB 79). This data is a requirement of SB 79 and its analysis to determine how the bill applies in the region. Other Senate Bill 79 Transit Feature Sets: Senate Bill 79 - Transit-Oriented Development Transit Station/Stop Access Points - https://mtc.maps.arcgis.com/home/item.html?id=51737b69343f45c7982d8bcf898f7f77 Senate Bill 79 - Transit-Oriented Development Transit Stations - https://mtc.maps.arcgis.com/home/item.html?id=a94e2c07f0f44869817a37e0da4a28cc Senate Bill 79 - Transit-Oriented Development Transit Stops - https://mtc.maps.arcgis.com/home/item.html?id=7906bd5706994abb833c878713d2038e
readySenate Bill 79 Transit Oriented Development Transit Stations
UpdatedJul 1, 2026This feature service provides transit stations in the San Francisco Bay Region that are applicable to California Senate Bill 79 (SB 79). This data is a requirement of SB 79 and its analysis to determine how the bill applies in the region. Other Senate Bill 79 Transit Feature Sets: Senate Bill 79 - Transit-Oriented Development Transit Station/Stop Access Points - https://mtc.maps.arcgis.com/home/item.html?id=51737b69343f45c7982d8bcf898f7f77 Senate Bill 79 - Transit-Oriented Development Transit Stops - https://mtc.maps.arcgis.com/home/item.html?id=7906bd5706994abb833c878713d2038e Senate Bill 79 - Transit-Oriented Development Zones - https://mtc.maps.arcgis.com/home/item.html?id=ff3aca5ea60145c0ad677edbbf3f896f
readySenate Bill 79 Transit Oriented Development Transit Stops
UpdatedJul 1, 2026This feature service provides transit stops in the San Francisco Bay Region that are applicable to California Senate Bill 79 (SB 79). This data is a requirement of SB 79 and its analysis to determine how the bill applies in the region. Other Senate Bill 79 Transit Feature Sets: Senate Bill 79 - Transit-Oriented Development Transit Station/Stop Access Points - https://mtc.maps.arcgis.com/home/item.html?id=51737b69343f45c7982d8bcf898f7f77 Senate Bill 79 - Transit-Oriented Development Transit Stations - https://mtc.maps.arcgis.com/home/item.html?id=a94e2c07f0f44869817a37e0da4a28cc Senate Bill 79 - Transit-Oriented Development Zones - https://mtc.maps.arcgis.com/home/item.html?id=ff3aca5ea60145c0ad677edbbf3f896f
readySenate Bill 79 Transit Oriented Development Transit Station/Stop Access Points
UpdatedJul 1, 2026This feature service provides pedestrian access points for transit stops and stations in the San Francisco Bay Region that are applicable to California Senate Bill 79 (SB 79). This data is a requirement of SB 79 and its analysis to determine how the bill applies in the region. Other Senate Bill 79 Transit Feature Sets: Senate Bill 79 - Transit-Oriented Development Transit Stations - https://mtc.maps.arcgis.com/home/item.html?id=a94e2c07f0f44869817a37e0da4a28cc Senate Bill 79 - Transit-Oriented Development Transit Stops - https://mtc.maps.arcgis.com/home/item.html?id=7906bd5706994abb833c878713d2038e Senate Bill 79 - Transit-Oriented Development Zones - https://mtc.maps.arcgis.com/home/item.html?id=ff3aca5ea60145c0ad677edbbf3f896f
readyPlan Bay Area 2050 Plus Growth Geographies
UpdatedApr 23, 2026Regional Growth Geographies are areas identified for housing and/or job growth either by local jurisdictions or due to their proximity to transit or access to opportunities. The overall definition of Growth Geographies was adopted by the Commission and Executive Board in January 2025. Growth Geographies include: Priority DevelopmentAreas (PDAs): Places designated by local governments served by transit and planned fornew homes and jobs at densities necessary to support effective transitservice. (See ABAG Resolution 02-2019 for detailed criteria.) PriorityProduction Areas (PPAs): Locally-identified places for middle-wage job growth in industries like manufacturing, logistics, or other trades; must be zoned for industrial use or have a predominantly industrial use. (See ABAG Resolution 02-2019 fordetailed criteria.) Transit-RichAreas (TRAs): Places near rail, ferry or frequent bus service that were not already identifiedas PDAs. Across the region, this includes all areas outside PDAs subject tothe Transit-Oriented Communities (TOC) Policy (MTC Resolution 4530). In jurisdictions where local governments have nominated PDAs on less than 50% of the land eligible for nomination, this also includes areas within ½ mile of a bus stop with peak service frequency of 15 minutes or less as defined during Plan Bay Area 2050. High-ResourceAreas (HRAs): Census Tracts designated “High” or “Highest” Resource by the California Departments of Housing and Community Development and Finance, with well-resourced schools and access to jobs, among other criteria. This designation only includes places that meet a baseline transit service threshold of bus service with peak headways of 30 minutes or better as defined during Plan Bay Area 2050. In addition, HRAs are only included if less than 50% of land eligible for Priority Development Area designation land has been nominated by the local jurisdiction in question. HRAs that are within TRAs are labeled as such, while others are labeled as “Basic Bus” TRAs.
readyPlan Bay Area 2050 Plus Priority Development Areas and Transit Oriented Communities One Mile Buffer
UpdatedFeb 13, 2026One-mile buffer of Plan Bay Area 2050+ Priority Development Areas (PDAs) and Transit-Oriented Communities (TOCs), for reference in determining PDA- and TOC-supportive investments for the One Bay Area Grant (OBAG) County Program. OBAG, now in its fourth cycle (OBAG 4), is designed to collaboratively implement Plan Bay Area priorities for transportation, housing, and the environment through local and regional investments that work together to improve connectivity, equity, and sustainability. OBAG 4 was adopted by the Metropolitan Transportation Commission (MTC) in January 2026 and includes $820 million in federal funding for projects from 2027 through 2030. OBAG 4 funds support implementation of Plan Bay Area 2050+, the region's long-range plan. The OBAG 4 county program is a flexible source of funding for local priorities, managed by MTC in partnership with the region's nine County Transportation Agencies. The OBAG 4 regional program is a more focused set of investments that support specific MTC initiatives and services across the region. See the OBAG 4 webpage for more details
readySan Francisco Bay Region Transit Stops
UpdatedDec 2, 2025This feature service provides transit stops for the San Francisco Bay Region that were produced by the California Department of Transportation (Caltrans). The features were extracted by Metropolitan Transportation Commission staff from statewide data produced by Caltrans. For information on how Caltrans developed the source data, and to access the complete data set, please visit the High Quality Transit Areas Analysis Open Data Portal.
readySan Francisco Bay Region Transit Routes
UpdatedDec 2, 2025This feature service provides transit routes from transit operators serving the San Francisco Bay Region. The source data were produced by the California Department of Transportation (Caltrans) and features for the region were extracted by Metropolitan Transportation Commission staff from the statewide data. For information on how Caltrans developed the source data, and to access the complete data set, please visit the High Quality Transit Areas Analysis Open Data Portal.
readyBay Trail Gap Closure Implementation Plan Prioritization Bay Trail Gaps (2024)
UpdatedNov 19, 2025About the Bay Trail: The San Francisco Bay Trail is an interconnected system of on- and off-street trails circumnavigating San Francisco and San Pablo Bays. The ultimate vision for the Bay Trail is a continuous, 500-mile trail around San Francisco and San Pablo Bays serving 47 cities in all nine Bay Area counties. As of 2024, 352 miles (70%) of the 500-mile vision have been constructed. The Bay Trail welcomes a variety of users including people who walk, bike, and roll. It is intended to be used for many purposes including recreation, commuting to work and school, running errands, accessing transit, and visiting friends and family. **The Open Data viewer is intended for general display of features and is not appropriate for feature exploration. Use the feature map viewer to explore trail feature attributes through symbology and filtering, or print a basic map.** About the Bay Trail Gap Closure Implementation Plan: The 2024 Bay Trail Gap Closure Implementation Plan (BTGCIP) sets priorities for future work to complete the vision of the San Francisco Bay Trail—an interconnected system of on- and off-street trails circumnavigating San Francisco and San Pablo Bays. Implementation of the trail began in the early 1990s and continues today. The purpose of the BTGCIP is to identify and evaluate segments of the Bay Trail and Connector Trails that are currently missing (i.e., trail gaps) in order to prioritize their design and construction as the full build-out of the Bay Trail is implemented. For more details about the Bay Trail Gap Closure Implementation Plan, scoring methodology, and results, please visit the Bay Trail Gap Closure Implementation plan website (https://mtc.ca.gov/operations/regional-trails-parks/san-francisco-bay-trail/bay-trail-gap-closure-implementation-plan) and interactive map (https://experience.arcgis.com/experience/817c5f3b503848deb44e83d337285fd6/#data_s=id%3AdataSource_2-18e39aa3ee3-layer-17%3A86). History: Senate Bill 100, authored by then-state Senator Bill Lockyer and passed into law in 1987, directed the Association of Bay Area Governments (ABAG) to develop a plan for this regional trail system including a specific alignment for the Bay Trail. The Metropolitan Transportation Commission works with ABAG to implement the Bay Trail Plan, adopted by ABAG in July 1989. It includes a proposed alignment; a set of policies to guide the future selection, design, and construction of routes; and strategies for implementation and financing. Since its inception, the Bay Trail Plan has enjoyed widespread support in the region.
readySan Francisco Bay Trail
UpdatedNov 19, 2025About the Bay Trail The San Francisco Bay Trail is an interconnected system of on- and off-street trails circumnavigating San Francisco and San Pablo Bays. The ultimate vision for the Bay Trail is a continuous, 500-mile trail around San Francisco and San Pablo Bays serving 47 cities in all nine Bay Area counties. As of 2024, 352 miles (70%) of the 500-mile vision have been constructed. The Bay Trail welcomes a variety of users including people who walk, bike and roll. It is intended to be used for many purposes including recreation, commuting to work and school, running errands, accessing transit, and visiting friends and family. **The Open Data viewer is intended for general display of features and is not appropriate for feature exploration. Use the feature map viewer to explore trail feature attributes through symbology and filtering, or print a basic map.** Trail Types Because the trail circumnavigates the entire San Francisco Bay, a wide variety of landscapes and experiences can be found. For a bustling scene, walk or bike the Embarcadero in San Francisco on a sunny (or foggy) afternoon. For peace and solitude interrupted only by bird song and windswept grasses, make your way to the Tubbs Island Trail on the shores of San Pablo Bay in Sonoma County. Nearly 227 miles of the existing Bay Trail are paved, and 127 miles are natural surface trails of varying widths. In some locations, the Bay Trail consists of bike lanes and sidewalks. In addition to walkers and cyclists, the trail is used by joggers, skaters, birdwatchers, photographers, kite-flyers, wheelchair riders, picnickers, and more. History of the San Francisco Bay Trail Senate Bill 100, authored by then-state Senator Bill Lockyer and passed into law in 1987, directed the Association of Bay Area Governments (ABAG) to develop a plan for this regional trail system including a specific alignment for the Bay Trail. The Metropolitan Transportation Commission works with ABAG to implement the Bay Trail Plan, adopted by ABAG in July 1989. It includes a proposed alignment; a set of policies to guide the future selection, design, and construction of routes; and strategies for implementation and financing. Since its inception, the Bay Trail Plan has enjoyed widespread support in the region.
readyPriority Conservation Areas (2025)
UpdatedOct 3, 2025This data layer, approved by the ABAG Executive Board in September 2025, maps all designated Priority Conservation Areas (PCAs) and their geographic boundaries. It incorporates all amendments approved following the PCA Refresh Final Report as well as the 2025 call for new PCA nominations. The PCA Refresh Final Report, adopted by the Association of Bay Area Governments’ Executive Board in May 2024, reformed the PCA planning framework by assessing the previous program, establishing an updated vision, goals, and objectives, and providing new eligibility maps to improve consistency and structure. As part of these reforms, existing PCAs were amended to align with the updated framework. Visit the PCA Website (https://mtc.ca.gov/planning/land-use/priority-conservation-areas-pcas) to learn more about PCAs, the Refresh, and the 2025 PCA nomination and amendment processes.
readyEquity Priority Communities Plan Bay Area 2050
UpdatedAug 11, 2025Plan Bay Area 2050 utilized this single data layer to inform the Plan Bay Area 2050 Equity Priority Communities (EPC). This data set was developed using American Community Survey (ACS) 2014-2018 data for eight variables considered. This data set represents all tracts within the San Francisco Bay Region and contains attributes for the eight Metropolitan Transportation Commission (MTC) Equity Priority Communities tract-level variables for exploratory purposes. These features were formerly referred to as Communities of Concern. Plan Bay Area 2050 Equity Priority Communities (tract geography) are based on eight ACS 2014-2018 (ACS 2018) tract-level variables: People of Color (70% threshold) Low-Income (less than 200% of Federal poverty level, 28% threshold) Level of English Proficiency (12% threshold) Seniors 75 Years and Over (8% threshold) Zero-Vehicle Households (15% threshold) Single-Parent Households (18% threshold) People with a Disability (12% threshold) Rent-Burdened Households (14% threshold) If a tract exceeds both threshold values for Low-Income and People of Color shares OR exceeds the threshold value for Low-Income AND also exceeds the threshold values for three or more variables, it is a EPC. Detailed documentation on the production of this feature set can be found in the MTC Equity Priority Communities project documentation.
readySan Francisco Bay Region Spheres of Influence
UpdatedAug 5, 2025The California Association Local Agency Formation Commissions defines a sphere of influence (SOI) as "a planning boundary outside of an agency’s legal boundary (such as the city limit line) that designates the agency’s probable future boundary and service area." This feature set represents the SOIs of the incorporated jurisdictions for the San Francisco Bay Region. The Metropolitan Transportation Commission (MTC) updated the feature set in late 2019 as part of the jurisdiction review process for the BASIS data gathering project. Changes were made to the growth boundaries of the following jurisdictions based on BASIS feedback and associated work: Antioch, Brentwood, Campbell, Daly City, Dublin, Fremont, Hayward, Los Gatos, Monte Sereno, Newark, Oakland, Oakley, Pacifica, Petaluma, Pittsburg, Pleasanton, San Bruno, San Francisco (added to reflect other jurisdictions whose SOI is the same as their jurisdiction boundary), San Jose, San Leandro, Santa Clara, Saratoga, and Sunnyvale. Notes: With the exception of San Mateo and Solano Counties, counties included jurisdiction (city/town) areas as part of their SOI boundary data. San Mateo County and Solano County only provided polygons representing the SOI areas outside the jurisdiction areas. To create a consistent, regional feature set, the Metropolitan Transportation Commission (MTC) added the jurisdiction areas to the original, SOI-only features and dissolved the features by name. Because of differences in base data used by the counties and the MTC, edits were made to the San Mateo County and Solano County SOI features that should have been adjacent to their jurisdiction boundary so the dissolve function would create a minimum number of features. Original sphere of influence boundary acquisitions: Alameda County - CityLimits_SOI.shp received as e-mail attachment from Alameda County Community Development Agency on 30 August 2019 Contra Costa County - BND_LAFCO_Cities_SOI.zip downloaded from https://gis.cccounty.us/Downloads/Planning/ on 15 August 2019 Marin County - 'Sphere of Influence - City' feature service data downloaded from Marin GeoHub on 15 August 2019 Napa County - city_soi.zip downloaded from their GIS Data Catalog on 15 August 2019 City and County of San Francisco - does not have a sphere of influence San Mateo County - 'Sphere of Influence' feature service data downloaded from San Mateo County GIS open data on 15 August 2019 Santa Clara County - 'City Spheres of Influence' feature service data downloaded from Santa Clara County Planning Office GIS Data on 15 August 2019 Solano County - SphereOfInfluence feature service data downloaded from Solano GeoHub on 15 August 2019 Sonoma County - 'SoCo PRMD GIS Spheres Influence.zip' downloaded from County of Sonoma on 15 August 2019
readyPlan Bay Area 2050 Growth Geographies
UpdatedAug 5, 2025The Plan Bay Area 2050 Growth Geographies were adopted by the Metropolitan Transportation Commission and Association of Bay Area Governments Executive Board in September 2020. These conceptual areas, which do not supersede local zoning control, are prioritized for new housing and jobs in the Plan Bay Area 2050 Final Blueprint, with specific density and land use assumptions based upon adopted Final Blueprint Strategies. The applicability of different Growth Geographies varies by local jurisdiction based upon the extent to which a jurisdiction has nominated Priority Development Areas, as shown below: All Jurisdictions Priority Development Areas (PDAs): Source - features are from Priority Development Areas (Plan Bay Area 2050). Processing for growth geographies - features from source data were not modified further. Source data is the same as what is in the growth geographies data. Priority Production Areas (PPAs): Source - features are from Priority Production Areas (Plan Bay Area 2050). Processing for growth geographies - features from source data were not modified further. Source data is the same as what is in the growth geographies data. Transit Rich Areas (partial): Source - features are portions of Transit Rich Areas that are within ½ mile of a regional rail station with headways of 15 minutes or better during the AM (6 AM to 10 AM) and PM (3 PM to 7 PM) peak periods, based on posted schedules in January 2020 or service enhancements in Plan Bay Area 2050, including Bay Area Rapid Transit (BART) and Caltrain Baby Bullet station areas. (Note: regional passenger rail systems include Altamont Commuter Express, BART, Caltrain, Sonoma-Marin Area Rail Transit, and Capitol Corridor, but only BART and Caltrain include stops meeting the headway standard.) Processing for growth geographies - these input features were temporary data used to determine the designation, and were clipped to the “exclusion areas” shown below as well as PDAs and PPAs, so were not modified beyond their production. Jurisdictions That Have Nominated Less Than 50 Percent of Their PDA Eligible Areas as PDAs Transit Rich Areas (partial): Source - features are portions of Transit Rich Areas that are not within a PDA, PPA, or within ½ mile of a regional rail station with 15 minute peak headways or less, as identified above. These Transit Rich Areas features include both High Resource Areas and places outside High Resource Areas. The features for this portion of Transit Rich Areas were created by placing a half-mile buffer around passenger rail stations, ferry terminals, and bus stops on routes with peak headways of 15 minutes or less during peak commute period that were selected from Major Transit Stops (2017) data, and by placing a half-mile buffer around passenger rail stations, ferry terminals, and bus rapid transit routes included in Plan Bay Area 2050. Processing for growth geographies - These input features were temporary data used to determine the designation, and were clipped to the “exclusion areas” shown below as well as PDAs and PPAs, so were not modified beyond their production. High Resource Areas: Source - features were created by selecting the intersection of High and Highest Resource Areas from CTCAC/HCD Resource Opportunity Areas (2020) data and a ¼ mile buffer around bus stops with peak headways of 16 to 30 minutes, based upon a January 2020 extract of the Google Transit Feed Specification for all Bay Area transit providers, supplemented by published bus schedules where necessary. Processing for growth geographies - these input features were temporary data used to determine the designation, and are outside the Growth Geographies highlighted above (PDAs, PPAs, and Transit Rich Areas), as well as the “exclusion areas” shown below, so were not modified beyond their production. Exclusion Areas The following areas are excluded from Growth Geographies. Also, these areas were not used in calculating the share of a jurisdiction’s PDA-eligible land locally nominated. County-adopted wildland urban interface areas, where available, Areas of unmitigated sea level rise (i.e., areas at risk from sea level rise through year 2050 that lack mitigation strategies in Plan Bay Area 2050 Environment Element), Areas outside locally-adopted urban growth boundaries, and Parkland and other open spaces within urbanized areas identified in the California Protected Areas Database. A complete description of how the Plan Bay Area 2050 Growth Geographies were developed can be found on the Plan Bay Area 2050 Growth Framework Mapping and Analysis page on GitHub.
readyGrowth Boundaries (2019)
UpdatedAug 5, 2025This data set contains features representing growth boundaries in the San Francisco Bay Region. The data set was developed by Greenbelt Alliance as part of their open space preservation mission. The Metropolitan Transportation Commission (MTC) updated the feature set in late 2019 as part of the jurisdiction review process for the BASIS data gathering project. Changes were made to the growth boundaries of the following jurisdictions based on their BASIS feedback: Antioch, Fremont, Livermore, Marin County, Pittsburg, Pleasanton, and San Ramon. The original features were created by referencing the local measures adopted by voters, city councils/boards of supervisors, or both and map images developed by local government. Web links to the measures and images are included in the attribute table. Greenbelt Alliance is responsible for updating the links to that information if their links change or the documents are taken offline. MTC's updates were made to a limited set of features using shapefiles downloaded from jurisdiction websites, hand editing features by referencing map images provided by jurisdictions, and erasing feature areas using base data features where one jurisdiction's growth boundary overlapped another jurisdiction's city limit. The MTC edits were limited, or related, to features receiving comments from jurisdiction reviewers. While commonly known as either Urban Growth Boundaries (UGBs) or Urban Limit Lines (ULLs), there are no standard designations so they are referred to by a number of designations in the attribute table (name). A couple of the alternative designations include Rural Urban Boundary and City Centered Corridor. Regardless of the designation used, growth boundaries are intended to control where development should be encouraged and discouraged. In this case, the polygons represent the areas where development should occur, and development outside the boundary is discouraged. Development proposed for areas outside the boundary is usually allowed based on special review and approval processes designated by the adopting jurisdiction. Jurisdictions are not required to adopt growth boundaries so the development restrictions imposed by them only apply to the cities and counties that create them. In the case of growth boundaries adopted by counties, they are usually developed with the consent and agreement of the cities adjacent to the county growth boundary.
readyActive Transportation Network (2022)
UpdatedJul 16, 2025This regional Active Transportation Network (AT Network) was developed by building upon local, county, and regional active transportation planning efforts throughout all nine counties in the San Francisco Bay Region. The AT Network is intended to support Plan Bay Area goals by focusing the region’s efforts on providing high comfort active transportation connections in areas with the highest potential for shifting auto trips to bicycling and walking trips, where there is the greatest need for affordable transportation options and where active trips connect people with transit. A network framework was developed and applied throughout the region to inform the development of the draft AT Network. The framework is based on three main criteria, including equity, safety and mode shift. These criteria were developed from the original stakeholder engagement in spring/summer 2021, and confirmed with the Technical Advisory Committee Active Transportation Working Group, the Policy Advisory Committee, and other stakeholder groups in August 2022. The feedback the project team received on the draft AT Network from stakeholders in February and March 2022 has also been incorporated into the updated approach. The network framework is outlined below: Planned route is located within or connects to (e.g. proximity): Priority Development Area, Equity Priority Community, Mobility Hub (within ½ mile), Transit Rich Area, and Parks/open space. The width of the AT Network corridors vary depending on the land use context and street network density. In incorporated areas where land use intensity and street network density tend to be greater, the Network corridor is defined as being a half-mile wide. This width is intended to provide some local flexibility in route selection while also encouraging direct and intuitive access to destinations. In more rural or less intensely developed areas, the Network is a mile wide to provide even more flexibility. The Network centered on regional trails have a thousand-foot buffer since, in most cases, planned trail alignments are established or would likely occur in relatively close proximity to the planned alignment.
readySan Francisco Bay Region Incorporated Cities and Towns
UpdatedJul 3, 2025Incorporated Places (cities and towns) are those reported to the Census Bureau as legally in existence as of May 28, 2021, under the laws of their respective states. Features were extracted from California 2020 TIGER/Line shapefile by the Metropolitan Transportation Commission. An incorporated place provides governmental functions for a concentration of people, as opposed to a minor civil division, which generally provides services or administers an area without regard, necessarily, to population. Places may extend across county and county subdivision boundaries, but never across state boundaries. An incorporated place usually is a city, town, village, or borough, but can have other legal descriptions.
readySan Francisco Bay Region Incorporated Cities and Towns (clipped)
UpdatedJul 2, 2025Incorporated Places (cities and towns) are those reported to the Census Bureau as legally in existence as of May 28, 2021, under the laws of their respective states. Features were extracted from, and clipped using, California 2020 TIGER/Line shapefiles by the Metropolitan Transportation Commission. An incorporated place provides governmental functions for a concentration of people, as opposed to a minor civil division, which generally provides services or administers an area without regard, necessarily, to population. Places may extend across county and county subdivision boundaries, but never across state boundaries. An incorporated place usually is a city, town, village, or borough, but can have other legal descriptions.
readyPriority Development Areas (Plan Bay Area 2050 Plus)
UpdatedJun 13, 2025This feature set contains the current boundaries of Priority Development Areas (PDAs) used by the Metropolitan Transportation Commission (MTC) and the Association of Bay Area Governments (ABAG) for analysis and mapping related to Plan Bay Area 2050+. These areas, which are nominated by a local government resolution and approved by the ABAG Executive Board, are eligible for grant funding allocated to planning and projects in PDAs. Plan Bay Area 2050+ is the latest update to the long-range Regional Transportation Plan and Sustainable Communities Strategy for the nine-county San Francisco Bay Region. It will update Plan Bay Area 2050, approved in 2021. This PDA feature set is limited to use in general mapping and analysis related to Plan Bay Area 2050+ and the planning activities of local governments that have nominated PDAs. More information on PDA planning at the Association of Bay Area Governments and Plan Bay Area 2050+ can be found at: Priority Development Areas - https://abag.ca.gov/our-work/land-use/pda-priority-development-areas. Plan Bay Area 2050+ -https://abag.ca.gov/our-work/land-use/plan-bay-area-2050. DO NOT USE this feature layer for mapping or analysis related to earlier versions of Plan Bay Area. Data and feature layers for those PDA versions are available as separate resources.
readyRegional Bikeway Network (2019)
UpdatedJun 13, 2025The Regional Bikeway Network (RBN), originally established in the 2001 Regional Bicycle Plan, defines the San Francisco Bay Region's continuous and connected bicycling corridors of regional significance. A primary purpose of the RBN, which includes both existing and unbuilt segments, is to focus regional bicycle-related funding on high-priority bicycle facilties that serve regional trips. Data for this feature set was gathered in December 2018. In 2009, almost 50% of the Network's 2,169 miles had been constructed. As of December 2018, 1,391 miles have been constructed, or 64% of the network.
readyMobility Hubs (2020) Updated
UpdatedJun 5, 2025With transportation services and infrastructure evolving rapidly, mobility hubs present an opportunity to flexibly design and integrate a variety of sustainable transportation options to enhance connectivity across the region. Unprecedented growth, affordability challenges, the climate crisis, and changing travel behaviors resulting from the pandemic show the need to prioritize low emission transportation options that support resiliency, choice, and embrace future changes in technology. The mobility hub program is a Climate Initiative Strategy from Plan Bay Area 2050. The primary goal is to reduce greenhouse gas emissions by reducing vehicle miles traveled. The program supports other regional and Plan Bay Area goals of increasing transit access and connectivity, focusing growth, increasing transit-oriented development and providing viable travel options to all Bay Area communities. To meet regional and Plan Bay Area 2050 goals, the methodology developed key objectives for the hub sites: Coordinated Mobility: sites with frequent and interjurisdictional transit service; Climate Action: potential to convert low-occupancy, solo vehicle trips to other sustainable modes such as transit, shared mobility options, biking, and walking; and Equitable Mobility: ability to achieve equitable outcomes through need-based mobility and anti-displacement measures. To meet these objectives, the Metropolitan Transportation Commission (MTC) conducted analysis to discover the full universe of mobility hubs in the region based on existing and planned transit connections, major trip generators, and areas of mobility need. The siting analysis identified 1,691 potential mobility hub locations that offer connections into the local and regional transit network or areas of mobility need with proximity to a potential hub anchor site. The resulting universe of locations were then categorized by hub typology based on the transportation and land use factors surrounding the hub site. All locations were then ranked based on factors that included transit connectivity, pedestrian and bicycle access, areas with potential for shift from solo driving trips, and location in Priority Development Areas, MTC Equity Priority Communities, and communities at high risk of displacement. The analysis process overlaid a grid (squares) over the region to divide it into small, equally sized grid cells. The tile grid enables consistent processing of different spatial data types such as points (like transit stops), lines (such as transit routes), and polygons (such as Priority Development Areas). Each tile represents a 1/4-mile square for all locations except in the region’s most dense cities: Oakland, San Francisco, and San Jose. In these cities, the tiles are 520 by 520 feet. With this approach, each tile captures the different characteristics of the area it contains. As the location of the hubs are the geographic center of their respective tile, they can appear in the middle of developed blocks and over water. The analysis methodology can be found in the Mobility Hub Advisory Services: Siting Criteria, Screening Methodology, and Prioritization report. Two jurisdictions requested their mobility hub locations be changed in late 2024 and the data was updated in early 2025. Mobility hub points that were moved outside their analysis grid cell do not have values for the flag and value attributes. These hubs are considered jurisdiction-identified hubs that are not to be considered part of the report mentioned above. Affected mobility hubs can be identified by searching for 'yes' in the modhub/Modified Hub attribute field. More information on mobility hub planning can be found at https://abag.ca.gov/technical-assistance/mobility-hubs-program-overview.
readyPassenger Railways (2024)
UpdatedMay 16, 2025Existing passenger and commuter railways that currently serve the San Francisco Bay Region. Railway types represented are heavy rail, light rail, and cable cars. Railways for the region are included for: Altamont Corridor Express (ACE) Amtrak (Capitol Corridor and regular passenger service) Bay Area Rapid Transit (BART) Caltrain San Francisco Municipal Railway (MUNI) Santa Clara Valley Transportation Authority (VTA) Sonoma-Marin Area Rail Transit (SMART)
readyPassenger Rail Stations (2024)
UpdatedMay 16, 2025Existing passenger, commuter, and light rail stations and stops for the San Francisco Bay Region. Cable Car stops in San Francisco are included in the light rail category. Rail stations and stops for the region are included for the following systems: Altamont Corridor Express (ACE) Amtrak (Capitol Corridor and regular passenger service) Bay Area Rapid Transit (BART) Caltrain San Francisco Municipal Railway (MUNI) (light rail and cable car) Santa Clara Valley Transportation Authority (VTA) Sonoma-Marin Area Rail Transit (SMART)
ready[DRAFT] Transit Oriented Community Transit Stations
UpdatedOct 1, 2024This feature service represents, Version 2 transit stations that were used to produce Transit-Oriented Community (TOC) Policy Areas for the San Francisco Bay Region. Data used to create this dataset were sourced from TOC Transit Stops - Existing (2023), TOC Transit Stations - Existing (2023), as well as from Transit Stops - Planned (Plan Bay Area 2050). TOC transit stations are a subset of Existing and Planned transit stops, representing stations served by rail, light rail, bus rapid transit, and ferry terminals. Stations are larger facilities that may house multiple transit stops serving different routes or modes of transit. This hierarchy is often defined by the transit agency and reflected in the General Transit Feed Specification data, though it is important to note that, for the purposes of the TOC policy, some transit stops are are considered stations regardless of whether they are part of a larger parent station. Stations used for the TOC may have used stop/station relationships defined by the transit agency or synthetic stations may have been created based on stop location proximity. Stations can be related to [DRAFT] Transit Oriented Communities Transit Stops (2023) by joining on sta_recid. The TOC Policy Areas were created from these features by producing a half-mile buffer around each major transit stop, station, and terminal that are part of this feature service. More information about the TOC Policy, including the full text of Metropolitan Transportation Commission Resolution Number 4530, can be found here: https://mtc.ca.gov/planning/land-use/transit-oriented-communities-toc-policy. Process documentation can be found on GitHub here: https://github.com/BayAreaMetro/dataviz-toc-policy/tree/main/data/components-processing/toc-fg-transit-stops-stations
readyEquity Priority Communities Plan Bay Area 2040
UpdatedSep 26, 2024This data set represents all urbanized tracts within the San Francisco Bay Region, and contains attributes for the eight Metropolitan Transportation Commission (MTC) Equity Priority Communities (EPC) tract-level variables for exploratory purposes. These features were formerly referred to as Communities of Concern (CoC). MTC 2018 Equity Priority Communities (tract geography) is based on eight ACS 2012-2016 tract-level variables: Persons of Color (70% threshold) Low-Income (less than 200% of Fed. poverty level, 30% threshold) Level of English Proficiency (12% threshold) Elderly (10% threshold) Zero-Vehicle Households (10% threshold) Single Parent Households (20% threshold) Disabled (12% threshold) Rent-Burdened Households (15% threshold) If a tract exceeds both threshold values for Low-Income and Person of Color shares OR exceeds the threshold value for Low-Income AND also exceeds the threshold values for three or more variables, it is a EPC. Detailed documentation on the production of this feature set can be found in the MTC Equity Priority Communities project documentation.
readySan Francisco Bay Region Counties (clipped)
UpdatedSep 20, 2024County boundaries for the San Francisco Bay Region, clipped to remove major coastal and bay water areas. Features were extracted from, and clipped using, California 2020 TIGER/Line shapefiles by the Metropolitan Transportation Commission. The 2020 TIGER/Line Shapefiles reflect available governmental unit boundaries of the counties and equivalent entities as of May 28, 2021. Counties and equivalent entities are primary legal divisions of states. In most states, these entities are termed “counties.” Each county or statistically equivalent entity is assigned a 3-character FIPS code that is unique within a state.
readySan Francisco Bay Trail Fieldwork Results
UpdatedAug 27, 2024About the Bay Trail The San Francisco Bay Trail is an interconnected system of on- and off-street trails circumnavigating San Francisco and San Pablo Bays. The ultimate vision for the Bay Trail is a continuous, 500-mile trail around San Francisco and San Pablo Bays serving 47 cities in all nine Bay Area counties. As of 2024, 352 miles (70%) of the 500-mile vision have been constructed. The Bay Trail welcomes a variety of users including people who walk, bike, and roll. It is intended to be used for many purposes including recreation, commuting to work and school, running errands, accessing transit, and visiting friends and family. **The Open Data viewer is intended for general display of features and is not appropriate for feature exploration. Use the feature map viewer to explore trail feature attributes through symbology and filtering, or print a basic map.** About the Bay Trail Fieldwork Review This feature class shows the results of fieldwork conducted on existing off-street (Class I) segments of the Bay Trail between Summer 2023 and Spring 2024. Some segments were not ridden during the fieldwork inventory, including on-street sections of the Bay Trail and off-street sections designated as existing after the fieldwork inventory was completed. Data collected includes information on: Paved/unpaved status Shoulder presence Bollards/trail obstructions Narrow trail/pinch points Maintenance needs Poor pavement quality Missing curb ramps Wayfinding signs Otherwise substandard segments, per Bay Trail Design Standards Trail segments are split into roughly 250 foot subsegments. The following scores are calculated for each subsegment: Pavement Condition Index. Indicates the number of poor pavement quality deficiencies identified along the subsegment. Trail Quality Score. Indicates the total number of deficiencies identified along the subsegment. This includes bollards/trail obstructions, narrow trail/pinch points, maintenance needs, poor pavement quality, missing curb ramps, and substandard segment tags. For more information about the Bay Trail Fieldwork Review, please visit the Bay Trail Gap Closure Implementation Plan site (https://mtc.ca.gov/operations/regional-trails-parks/san-francisco-bay-trail/bay-trail-gap-closure-implementation-plan) and Bay Trail Fieldwork Review interactive map (https://apd.maps.arcgis.com/apps/instant/sidebar/index.html?appid=28f37bb22bd0430c9d8c2567ee614e3e). History Senate Bill 100, authored by then-state Senator Bill Lockyer and passed into law in 1987, directed the Association of Bay Area Governments (ABAG) to develop a plan for this regional trail system including a specific alignment for the Bay Trail. The Metropolitan Transportation Commission works with ABAG to implement the Bay Trail Plan, adopted by ABAG in July 1989. It includes a proposed alignment; a set of policies to guide the future selection, design, and construction of routes; and strategies for implementation and financing. Since its inception, the Bay Trail Plan has enjoyed widespread support in the region.
ready2023 Transportation Improvement Program Projects Polygon
UpdatedApr 23, 2024Polygon feature from the full set of projects that are part of the 2023 Transportation Improvement Program (TIP). The TIP lists the near-term transportation projects, programs and investment priorities of the region’s surface transportation system that have a federal interest — meaning projects or programs for which federal funds or actions by federal agencies are anticipated — along with locally and state-funded projects that are regionally significant. A regionally significant project, generally large scale, changes travel patterns over a relatively large geographic area. The TIP signifies the start of implementation of the programs and policies approved in the San Francisco Bay Region’s long-range transportation plan. It does this by identifying specific projects over a four-year time-frame that will help move the region toward its transportation vision. Locally funded transit operations, roadway maintenance projects, planning efforts and minor sidewalk or intersection improvements are generally not included in the TIP. Other 2023 TIP projects are included in: 2023 Transportation Improvement Program Projects - Point 2023 Transportation Improvement Program Projects - Line 2023 TIP Projects map More information on the 2023 Transportation Improvement Program can be found at https://mtc.ca.gov/funding/transportation-improvement-program/draft-2023-tip.
ready2023 Transportation Improvement Program Projects Point
UpdatedApr 23, 2024Point features from the full set of projects that are part of the 2023 Transportation Improvement Program (TIP). The TIP lists the near-term transportation projects, programs and investment priorities of the region’s surface transportation system that have a federal interest — meaning projects or programs for which federal funds or actions by federal agencies are anticipated — along with locally and state-funded projects that are regionally significant. A regionally significant project, generally large scale, changes travel patterns over a relatively large geographic area. The TIP signifies the start of implementation of the programs and policies approved in the San Francisco Bay Region’s long-range transportation plan. It does this by identifying specific projects over a four-year time-frame that will help move the region toward its transportation vision. Locally funded transit operations, roadway maintenance projects, planning efforts and minor sidewalk or intersection improvements are generally not included in the TIP. Other 2023 TIP projects are included in: 2023 Transportation Improvement Program Projects - Line 2023 Transportation Improvement Program Projects - Polygon 2023 TIP Projects map More information on the 2023 Transportation Improvement Program can be found at https://mtc.ca.gov/funding/transportation-improvement-program/draft-2023-tip.
ready2023 Transportation Improvement Program Projects Line
UpdatedApr 23, 2024Linear features from the full set of projects that are part of the 2023 Transportation Improvement Program (TIP). The TIP lists the near-term transportation projects, programs and investment priorities of the region’s surface transportation system that have a federal interest — meaning projects or programs for which federal funds or actions by federal agencies are anticipated — along with locally and state-funded projects that are regionally significant. A regionally significant project, generally large scale, changes travel patterns over a relatively large geographic area. The TIP signifies the start of implementation of the programs and policies approved in the San Francisco Bay Region’s long-range transportation plan. It does this by identifying specific projects over a four-year time-frame that will help move the region toward its transportation vision. Locally funded transit operations, roadway maintenance projects, planning efforts and minor sidewalk or intersection improvements are generally not included in the TIP. Other 2023 TIP projects are included in: 2023 Transportation Improvement Program Projects - Points 2023 Transportation Improvement Program Projects - Polygon 2023 TIP Projects map More information on the 2023 Transportation Improvement Program can be found at https://mtc.ca.gov/funding/transportation-improvement-program/draft-2023-tip.
readySan Francisco Bay Region 2020 Census Tracts (clipped)
UpdatedApr 2, 2024This feature layer contains census tracts for the San Francisco Bay Region for Census 2020. The features were extracted from a statewide data set downloaded from the United States Census Bureau by Metropolitan Transportation Commission staff. The purpose of this feature layer is for the production of feature sets for public access and download to avoid licensing issues related to the agency's base data. Source data downloaded from https://www.census.gov/geographies/mapping-files/time-series/geo/tiger-line-file.html ____________________________________ The TIGER/Line Files are shapefiles and related database files (.dbf) that are an extract of selected geographic and cartographic information from the United States Census Bureau's Master Address File/Topologically Integrated Geographic Encoding and Referencing (MAF/TIGER) Database (MTDB). The MTDB represents a seamless national file with no overlaps or gaps between parts, however, each TIGER/Line File is designed to stand alone as an independent data set, or they can be combined to cover the entire nation. Census tracts are small, relatively permanent statistical subdivisions of a county or equivalent entity, and were defined by local participants as part of the Census 2020 Participant Statistical Areas Program (PSAP). The Census Bureau delineated the census tracts in situations where no local participant existed or where all the potential participants declined to participate. The primary purpose of census tracts is to provide a stable set of geographic units for the presentation of census data and comparison back to previous decennial censuses. Census tracts generally have a population size between 1,500 and 8,000 people, with an optimum size of 4,000 people. When first delineated, census tracts were designed to be homogeneous with respect to population characteristics, economic status, and living conditions. The spatial size of census tracts varies widely depending on the density of settlement. Physical changes in street patterns caused by highway construction, new development, etc. may require boundary revisions before a census. In addition, census tracts occasionally are split due to population growth, or combined as a result of substantial population decline. Census tract boundaries generally follow visible and identifiable features. They may follow legal boundaries such as minor civil division (MCD) or incorporated place boundaries in some States and situations to allow for census tract-to-governmental unit relationships where the governmental boundaries tend to remain unchanged between censuses. State and county boundaries are always census tract boundaries in the standard census geographic hierarchy. In a few rare instances, a census tract may consist of noncontiguous areas. These noncontiguous areas may occur where the census tracts are coextensive with all or parts of legal entities that are themselves noncontiguous.
readySan Francisco Bay Region 2000 Census Tracts (clipped)
UpdatedApr 2, 2024This feature layer contains census tracts for the San Francisco Bay Region for Census 2000. The features were extracted from a statewide data set downloaded from the United States Census Bureau by Metropolitan Transportation Commission staff. The purpose of this feature layer is for the production of feature sets for public access and download to avoid licensing issues related to the agency's base data. Source data downloaded from https://www.census.gov/geographies/mapping-files/time-series/geo/tiger-line-file.html ____________________________________ The TIGER/Line Files are shapefiles and related database files (.dbf) that are an extract of selected geographic and cartographic information from the United States Census Bureau's Master Address File/Topologically Integrated Geographic Encoding and Referencing (MAF/TIGER) Database (MTDB). The MTDB represents a seamless national file with no overlaps or gaps between parts, however, each TIGER/Line File is designed to stand alone as an independent data set, or they can be combined to cover the entire nation. Census tracts are small, relatively permanent statistical subdivisions of a county or equivalent entity, and were defined by local participants as part of the Census 2000 Participant Statistical Areas Program (PSAP). The Census Bureau delineated the census tracts in situations where no local participant existed or where all the potential participants declined to participate. The primary purpose of census tracts is to provide a stable set of geographic units for the presentation of census data and comparison back to previous decennial censuses. Census tracts generally have a population size between 1,500 and 8,000 people, with an optimum size of 4,000 people. When first delineated, census tracts were designed to be homogeneous with respect to population characteristics, economic status, and living conditions. The spatial size of census tracts varies widely depending on the density of settlement. Physical changes in street patterns caused by highway construction, new development, etc. may require boundary revisions before a census. In addition, census tracts occasionally are split due to population growth, or combined as a result of substantial population decline. Census tract boundaries generally follow visible and identifiable features. They may follow legal boundaries such as minor civil division (MCD) or incorporated place boundaries in some States and situations to allow for census tract-to-governmental unit relationships where the governmental boundaries tend to remain unchanged between censuses. State and county boundaries are always census tract boundaries in the standard census geographic hierarchy. In a few rare instances, a census tract may consist of noncontiguous areas. These noncontiguous areas may occur where the census tracts are coextensive with all or parts of legal entities that are themselves noncontiguous.
readySan Francisco Bay Region 2010 Census Tracts (clipped)
UpdatedApr 2, 2024This feature layer contains census tracts for the San Francisco Bay Region for Census 2010. The features were extracted from a statewide data set downloaded from the United States Census Bureau by Metropolitan Transportation Commission staff. The purpose of this feature layer is for the production of feature sets for public access and download to avoid licensing issues related to the agency's base data. Source data downloaded from https://www.census.gov/geographies/mapping-files/time-series/geo/tiger-line-file.html ____________________________________ The TIGER/Line Files are shapefiles and related database files (.dbf) that are an extract of selected geographic and cartographic information from the United States Census Bureau's Master Address File/Topologically Integrated Geographic Encoding and Referencing (MAF/TIGER) Database (MTDB). The MTDB represents a seamless national file with no overlaps or gaps between parts, however, each TIGER/Line File is designed to stand alone as an independent data set, or they can be combined to cover the entire nation. Census tracts are small, relatively permanent statistical subdivisions of a county or equivalent entity, and were defined by local participants as part of the Census 2010 Participant Statistical Areas Program (PSAP). The Census Bureau delineated the census tracts in situations where no local participant existed or where all the potential participants declined to participate. The primary purpose of census tracts is to provide a stable set of geographic units for the presentation of census data and comparison back to previous decennial censuses. Census tracts generally have a population size between 1,500 and 8,000 people, with an optimum size of 4,000 people. When first delineated, census tracts were designed to be homogeneous with respect to population characteristics, economic status, and living conditions. The spatial size of census tracts varies widely depending on the density of settlement. Physical changes in street patterns caused by highway construction, new development, etc. may require boundary revisions before a census. In addition, census tracts occasionally are split due to population growth, or combined as a result of substantial population decline. Census tract boundaries generally follow visible and identifiable features. They may follow legal boundaries such as minor civil division (MCD) or incorporated place boundaries in some States and situations to allow for census tract-to-governmental unit relationships where the governmental boundaries tend to remain unchanged between censuses. State and county boundaries are always census tract boundaries in the standard census geographic hierarchy. In a few rare instances, a census tract may consist of noncontiguous areas. These noncontiguous areas may occur where the census tracts are coextensive with all or parts of legal entities that are themselves noncontiguous.
readyHigh Quality Transit Corridors 1/4 Mile (2017)
UpdatedFeb 22, 2024This data set contains high-quality transit corridors in the nine-county San Francisco Bay Region as defined in the California Public Resources Code, Section 21155(b)(3), consistent with Senate Bill 375: Existing fixed-route bus corridor with headway of 15 minutes or better during both the morning and evening peak periods; or Fixed-route bus corridor with headway of 15 minutes for better during both the morning and evening peak periods in an adopted Regional Transportation Plan. This data set was developed using several data sources that include Planned Transit Systems identified in the Plan Bay Area 2040 Regional Transportation Plan, Existing Transit locations extracted from the 511 Regional Transit Database, and manual editing conducted by the Spatial Modeling team at the Metropolitan Transportation Commission. The corridor features represent a quarter-mile buffer around the transit routes that meet the above conditions. Note that the corridor alignments were developed using the best available data or, when necessary, by identifying the shortest route between two consecutive stops on that service.
ready
All endpoints loaded (106 total)