Stirling Council Flood Protection Schemes
Stirling Council Flood Protection Schemes is a public ArcGIS Hub or REST source for Stirling maintained by Stirling. It exposes 13 service-backed datasets with Queryable ArcGIS FeatureServer and MapServer records exposed through layer endpoints for discovery, preview, and connection workflows.
Public data
About this public data
Stirling Council Flood Protection Schemes is a public data source published by Stirling for Stirling, United Kingdom. It is listed in Open data sources and made available under OGL, with the latest catalogue update recorded on May 18, 2026.
This catalogue entry connects 13 public source references, preview assets, or live views so teams can evaluate the data before adding it to a workspace.
- Provider:Stirling
- Category:Open data sources
- Geography:Stirling, United Kingdom
- Sources:13
BOFA FPS Construction Details
UpdatedMay 27, 2026Bridge of Allan FPS alignment with details on wall types and cladding (May 2026)
readyBridge of Allan 2025 100 Year With Scheme
UpdatedOct 14, 2025100 Year With Scheme flood extents from the 2025 model update of Bridge of Allan
readyBridge of Allan 2025 100 Year Baseline
UpdatedOct 14, 2025100 Year baseline flood extents from the 2025 model update of Bridge of Allan
readyStirling City Centre Flood Study form
UpdatedMar 18, 2025readyCallander SWMP 2 Year
UpdatedOct 22, 2024readyCallander SWMP 10 Year
UpdatedJun 14, 2024readyCallander SWMP 100 Year
UpdatedMay 7, 2024readyCallander SWMP 100 Year Early Model
UpdatedMay 7, 2024readyCallander SWMP 20 Year
UpdatedMay 7, 2024readyCommunity Verification Additions
UpdatedMar 5, 2024readyBridge of Allan Existing Defence Alignment Full
UpdatedMar 4, 2024Existing defences in Bridge of Allan including the bund on the right bank.
readyBridge of Allan Preferred Option 200 Year
UpdatedMar 4, 2024The estimated 1 in 200 year flood extent with the Bridge of Allan flood protection scheme preferred option (2B) installed.
readyBridge of Allan Preferred Option Alignment
UpdatedMar 4, 2024The preferred option alignment (Option 2B) identified in 2024 to be taken forward as the Bridge of Allan flood protection scheme.
readyBridge of Allan Flood Extents
UpdatedMar 1, 2024Bridge of Allan Flood Extents from the 2020 hydraulic model developed by WSP for the Bridge of Allan flood protection scheme. Note: climate change uplift applied is 40%, this is now 56%.
ready
All endpoints loaded (14 total)