ECWRPC Open Data Portal
ECWRPC Open Data Portal is a public ArcGIS Hub or REST source for East Central Wisconsin maintained by ECWRPC. It exposes 5 service-backed datasets with Queryable ArcGIS feature and map service layers with record previews through REST query endpoints for discovery, preview, and connection workflows.
Public data
About this public data
ECWRPC Open Data Portal is a public data source published by ECWRPC for East Central Wisconsin, United States. It is listed in Open data sources and made available under OGL, with the latest catalogue update recorded on May 18, 2026.
This catalogue entry connects 5 public source references, preview assets, or live views so teams can evaluate the data before adding it to a workspace.
- Provider:ECWRPC
- Category:Open data sources
- Geography:East Central Wisconsin, United States
- Sources:5
Sewer Service Area Boundaries (All)
UpdatedJun 27, 2024Sewer Service Area (SSA) Plans have been developed for twenty-six 208 Water Quality Areas within the Designated ‘208’ Water Quality Planning Area of the East Central Region. SSA Plans are required underWisconsin Administrative Code NR-121 for certain communities within Wisconsin and assist in maintaining and improving water quality within the State by outlining areas which are able to accommodate sewered development in a well-managed environment as well as delineatingEnvironmentally Sensitive Areas which preclude such development. SSA Plans also serve as the long-term plan (20-40 years) for the community’s wastewater treatment plant and collection infrastructure and are used as guidance during the Facilities Planning process established under Wisconsin Administrative Code NR-110. East Central prepares and administers SSA Plans under an agreement and funding arrangement with the Wisconsin Department of Natural Resources. The plans are meant to be flexible and are periodically updated (approximately every 5-6 years) in order to accommodate unanticipated changes in the community. All twenty-six SSA Plans, initially prepared in 1985, will have been updated at least once by the end of 2002. An SSA Plan Update Schedule has been developed for future plan updates which will ensure their review on a timely basis. This schedule will be subject to some changes based on timing, funding, and other local priorities. SSA Plan amendments and updates are reviewed/completed by staff and submitted to the Commission’s Community Facilities Committee (CFC) and/or the full Commission for approval. Once the Commission has approved the plan modification, it is submitted to the WDNR for final review and certification. Please note that the plan amendment process can take up to 3 months from start to finish! The Commission’s SSA Amendment procedures are contained within the individual SSA Plan documents. Additional, general information on Sewer Service Area Plans can be found on the Wisconsin DNR’s Sewer Service Area Planning Web Page. East Central is also responsible for the review of public sanitary sewer extensions, facilities plans, and the subsequent issuance of Water Quality Management Letters (sometimes referred to as ‘WQM’ or ‘208’ letters). These letters are required by WDNR to ensure that the proposed project is consistent with the existing Water Quality Management SSA) Plan. Please note that the ‘208’ review process can take up to 30 days and submittals should allow for this!
readyESA
UpdatedFeb 13, 2023Wetland areas with 50 foot buffer. Streams with 75 foot buffer. Updated 1/18/2023.
readyWisconsin FAF5
UpdatedMar 5, 2021The creation of the fifth generation of FAF (FAF5) is underway, and the regional database for the benchmark year of 2017 is now available. Future releases of FAF5 will include annual estimates, historical time series, forecasts, tabulation and visualization tools, and network files based on the 2017 Commodity Flow Survey. The FAF5 Regional Database of tonnage, value, and ton-miles by FAF regions of origin and destination, commodity type, and mode, benchmarked to the 2017 Commodity Flow Survey is available. Weights are in thousands of tons, activity is in millions of ton-miles, and values are in millions of 2017 constant dollars. Files are available in .csv and MS Access formats. Website - https://www.bts.gov/faf Attributes - dms_dest = FAF region or state where a freight movement ends the domestic portion of shipment. For exports, this is the US exit region where an export leaves the United States. fr_dest = Foreign region of shipment destination fr_inmode = Mode used between a foreign region and the US entry region for the imported goods dms_mode = Mode used between domestic origins and destinations fr_outmode = Mode used between the US exit region and foreign region for the exported goods sctg2 = 2-digit level of the Standard Classification of Transported Goods trade_type = Type of trade value = Total value (in 2017 dollar) of commodities shipped (unit: Million $) tons = Total weight of commodities shipped (unit: Thousand Tons)
readyMPO Boundary Files
UpdatedFeb 12, 2018Metropolitan Planning Organization (MPO) Boundary Files include: Appleton TMA Planning Area Boundary Appleton TMA Adjusted Urbanized Boundary Oshkosh MPO Planning Area Boundary Oshkosh MPO Adjusted Urbanized Boundary Fond du Lac MPO Planning Area Boundary Fond du Lac MPO Adjusted Urbanized Boundary
readyDemographicData BlockGroup
UpdatedAug 10, 2015Tapestry Segment summaries The 67 distinct markets of Tapestry detail the diversity of the American population. Grouping the segments can simplify these differences by summarizing markets that share similar traits. There are 14 LifeMode groups and 6 Urbanization groups. LifeMode groups LifeMode groups represent markets that share a common experience—born in the same generation or immigration from another country—or a significant demographic trait, like affluence. Tapestry Segments are classified into 14 LifeMode groups.
ready
All endpoints loaded (5 total)