City Of Moreton Bay Datahub
City Of Moreton Bay Datahub is a public ArcGIS Hub or REST source for City of Moreton Bay maintained by Gov. It exposes 109 service-backed datasets with Queryable ArcGIS FeatureServer and MapServer records exposed through layer endpoints for discovery, preview, and connection workflows.
Public data
About this public data
City Of Moreton Bay Datahub is a public data source published by Gov for City of Moreton Bay, Australia. It is listed in Open data sources and made available under OGL, with the latest catalogue update recorded on May 18, 2026.
This catalogue entry connects 109 public source references, preview assets, or live views so teams can evaluate the data before adding it to a workspace.
- Provider:Gov
- Category:Open data sources
- Geography:City of Moreton Bay, Australia
- Sources:109
CMB Council Assets
UpdatedNov 26, 2026Please note this data is updated daily. To download data click on the layer's tab below and select a layer. It may take a few seconds for the download page to load.
readyCMB Underground Assets for BYDA
UpdatedNov 26, 2026This layer represents underground infrastructure within the City of Moreton Bay (CMB) region, compiled for submission to the Before You Dig Australia (BYDA) platform. It includes a comprehensive set of spatial data detailing: Stormwater Assets – Pipes, pits, and drainage structures managed by council Council Data Conduits – Underground conduits containing council-managed data infrastructure Power Conduits – Electrical service conduits and associated underground utilities The dataset supports planning, excavation, and asset protection activities by providing accurate and up-to-date information on subsurface infrastructure. It is intended for use by contractors, planners, and council staff involved in civil works and utility coordination. Usage Notes: This layer is for reference only and should be used in conjunction with official BYDA responses and field verification. Asset locations are approximate and subject to change
readyPlatypus eDNA Sample results
UpdatedNov 25, 2026This dataset contains results from the City of Moreton Bay’s regional waterway environmental DNA (eDNA) surveys for platypus. eDNA sampling detects traces of genetic material that animals leave in the water, so platypus presence can be detected without seeing or catching them. The results show sample locations and detection outcomes, supporting understanding of where platypus occur, waterway health monitoring, and conservation and biodiversity planning.
ready2023 Contours 0.25m
UpdatedNov 25, 2026This dataset contains 0.25 metre interval contour lines across the City of Moreton Bay region, generated from 2023 elevation data. Contours show the shape and elevation of the land and can be used for topographic mapping, site analysis, drainage and overland flow assessment, and general planning. Contours are indicative only and should not replace a detailed site survey.
readyStormtide Data Notes Polygons
UpdatedNov 25, 2026Describes the expected reliability of the flood data including indication of specific areas where Council is of the opinion that the data has limited reliability and a reason for this limited reliability. The notes polygon dataset stores spatial definitions of model areas of known lower data reliability or subject to review.
readyState Government Trails
UpdatedNov 25, 2026Overview This feature service contains State Government owned and maintained trail and track features in the Moreton Bay Region. It brings together linear access features such as walking trails, mountain bike tracks, horse trails and boardwalks, along with supporting attributes about access restrictions, ownership, maintenance, status and trail use classifications. Feature Layers State_Gov_Trails: A layer of trail and track features with descriptive and operational attributes covering access, ownership, maintenance responsibility, surface material, user access and trail classification. Geographic Coverage The service covers the Moreton Bay Region in south-east Queensland, Australia. Use Cases Locating and reviewing State Government trail and track assets. Understanding access and use characteristics for walking, cycling and horse riding routes. Supporting mapping and management of public recreation and access corridors.
readySportsfields
UpdatedNov 25, 2026A collection of sportsfields in the Moreton Bay Region
readyShorebird Roosts
UpdatedNov 25, 2026Current 2021 shorebird roost mapping within Moreton Bay Regional Council local government area, including extent of roosts mapped in 2009 by Qld Wader Study Group. The boundary for each current roost site encompasses the full extent of shorebird use of the site during all surveys conducted at the site. Metadata includes shorebird count data for each roost site over the period 1991 to February 2021 inclusive.
readyRegional Coastal Survey Contours (2025)
UpdatedNov 25, 2026The Regional Coastal Aerial Survey (RCAS) is an ongoing monitoring program across the CMB coastal zone. The project captures high-resolution aerial imagery and topographic survey data at regular intervals (currently three-yearly) and following major coastal events. The survey provides essential information to assess the current condition of coastal assets such as seawalls, groynes, and beaches, support planning, design, and maintenance activities, and provide a reference dataset for comparing historic and future coastal conditions. Contours are lines on a map that connect points of equal elevation above a specified datum (such as mean sea level). They represent the shape and slope of the terrain, with closely spaced lines indicating a steep slope and widely spaced lines indicating a gentle slope. The data shared here is for informational and visualisation purposes only and may not contain the accuracy for comprehensive 3D modelling, site-specific analysis or navigational purposes. Please contact us through council website to get reports and detailed information.
readyRegional Coastal Survey Contours (2024)
UpdatedNov 25, 2026The Regional Coastal Aerial Survey (RCAS) is an ongoing monitoring program across the CMB coastal zone. The project captures high-resolution aerial imagery and topographic survey data at regular intervals (currently three-yearly) and following major coastal events. The survey provides essential information to assess the current condition of coastal assets such as seawalls, groynes, and beaches, support planning, design, and maintenance activities, and provide a reference dataset for comparing historic and future coastal conditions. Contours are lines on a map that connect points of equal elevation above a specified datum (such as mean sea level). They represent the shape and slope of the terrain, with closely spaced lines indicating a steep slope and widely spaced lines indicating a gentle slope. The data shared here is for informational and visualisation purposes only and may not contain the accuracy for comprehensive 3D modelling, site-specific analysis or navigational purposes. Please contact us through council website to get reports and detailed information.
readyRegional Coastal Survey Aerial (2025)
UpdatedNov 25, 2026The Regional Coastal Aerial Survey (RCAS) is an ongoing monitoring program across the CMB coastal zone. The project captures high-resolution aerial imagery and topographic survey data at regular intervals (currently three-yearly) and following major coastal events. The survey provides essential information to assess the current condition of coastal assets such as seawalls, groynes, and beaches, support planning, design, and maintenance activities, and provide a reference dataset for comparing historic and future coastal conditions. Orthoimages are aerial photographs that have been geometrically corrected ("orthorectified") to remove distortions caused by camera tilt, terrain variations, and lens properties. The data shared here is for informational and visualisation purposes only and may not contain the accuracy for comprehensive 3D modelling, site-specific analysis or navigational purposes. Please contact us through council website to get reports and detailed information.
readyRegional Coastal Survey Aerial (2024)
UpdatedNov 25, 2026The Regional Coastal Aerial Survey (RCAS) is an ongoing monitoring program across the CMB coastal zone. The project captures high-resolution aerial imagery and topographic survey data at regular intervals (currently three-yearly) and following major coastal events. The survey provides essential information to assess the current condition of coastal assets such as seawalls, groynes, and beaches, support planning, design, and maintenance activities, and provide a reference dataset for comparing historic and future coastal conditions. Orthoimages are aerial photographs that have been geometrically corrected ("orthorectified") to remove distortions caused by camera tilt, terrain variations, and lens properties. The data shared here is for informational and visualisation purposes only and may not contain the accuracy for comprehensive 3D modelling, site-specific analysis or navigational purposes. Please contact us through council website to get reports and detailed information.
readyPacific Harbour Hydrographic Survey August 2022
UpdatedNov 25, 2026Port of Brisbane Pty Ltd were commissioned by City of Moreton Bay (CMB) to undertake an investigation hydrographic survey of the Pacific Harbour Canal estate and a portion of the adjacent Pumicestone Passage. The survey data is used by CMB to inform future maintenance dredging campaigns of the canal system, specifically with regard to the design of areas to be dredged, dredging methodologies and quantities. The investigation survey data is also used for the refinement and long term planning of siltation rates and patterns in the canal system. Data was collected to MSQ ‘Class A’ Standard for the canal system and to ‘Class C’ Standard for Pumicestone Passage. It is noted that Vertical Datum for the survey plans is Australian Height Datum (AHD) (Note: at Pacific Harbour Canal, 0.0m LAT = -1.1m AHD). The survey data should not be used for Navigation purposes.
readyOverlandflow Notes Polygon
UpdatedNov 25, 2026Describes the expected reliability of the flood data including indication of specific areas where Council is of the opinion that the data has limited reliability and a reason for this limited reliability. The notes polygon dataset stores spatial definitions of model areas of known lower data reliability or subject to review.
readyMBRC Park Details
UpdatedNov 25, 2026This data is updated weekly. A collection of the parks in The Moreton Bay region each categorised with the facilities they have. The Moreton Bay Region has a diverse range of open spaces, parks and gardens that help build a healthy, active, vibrant and connected community. Use the following layer to view Council parks and facilities. Each features contains details such as the availability of: Skate Parks, Carparks, Dog Off-Leash areas, BBQs, Fitness Equipment, Playgrounds broken down into what they contain, Picnic sets, Bins, Shelters, Toilets, Water fountains and Basketball Courts and Beach access.
readyMBRC CCTV Cameras
UpdatedNov 25, 2026This data is updated weekly. A layer showing the location of CCTV Cameras in the Moreton Bay Region.
readyKoala Monitoring The Mill
UpdatedNov 25, 2026Koala Monitoring Program Council has engaged Endeavour Veterinary Ecology (EVE) to conduct a koala monitoring program at The Mill site during the operational works and construction stage. This program involves fitting koalas with bio-telemetry collars for monitoring, carrying out regular health assessments and providing veterinary treatment in the case of injury or disease. As of 31 February 2022, 113 koalas have been fitted with telemetry devices for monitoring purposes and undergo regular health checks. The monitoring has assisted officers to locate koalas before construction activities and protect them while works are being undertaken. The Mill PDA – Protecting the environmental values - Moreton Bay Regional Council Data of known Koala locations is updated on a periodic basis.
readyFlood Data Notes Polygons
UpdatedNov 25, 2026Describes the expected reliability of the flood data including indication of specific areas where Council is of the opinion that the data has limited reliability and a reason for this limited reliability. The notes polygon dataset stores spatial definitions of model areas of known lower data reliability or subject to review.
readyFlood Extent Overland Flow
UpdatedNov 25, 2026Moreton Bay City Flood Database River and Creek Flooding Version 3.1.0 (October 2023) This theme shows river and creek flooding caused by long duration heavy rainfall, typically lasting between 1 hour and 1 day. Sometimes this rain falls over a whole catchment or a number of catchments. This extended period of heavy rainfall causes the water levels in the river or creek to rise and escape the main channel. It may take a number of hours or days for these floodwaters to rise, reach a peak and then subside. Existing Conditions Maximum Scenario: Maximum of modelled flood behaviour in rivers and creeks for different design rainfall events under existing climate and catchment conditions - with and without structure (bridges and culverts) blockage. Purpose: To determine flood levels and flows for different design rainfall events for design of infrastructure with and without bridges and culverts being blocked by debris. Methodology: Coupled hydrologic (WBNM) and hydraulic (TUFLOW) modelling using a two-dimensional regular grid, 1D culvert structures, 2D bridge structures and a design burst rainfall approach based on Australian Rainfall and Runoff 2019 guideline (ARR2019). Blockage calculated based on ARR2019 recommendations. Refer technical publications available from Council's website for further detail. Flood Height: Indicates the approximate water surface level of potential inundation during a computer-modelled flood event, expressed in metres above mean sea level. This dataset represents the flood height values as contour lines using a contour interval of 0.2m. Modelled Probability: The dataset includes three possible flood events of different probability. Likelihood: Likely Annual Exceedance Probability (AEP): 5% Average Recurrence Interval (ARI): 20 Year Likelihood: Possible Annual Exceedance Probability (AEP): 1% Average Recurrence Interval (ARI): 100 Year Likelihood: Unlikely Annual Exceedance Probability (AEP): 0.1% Average Recurrence Interval (ARI): 1,000 Year: 0.1% Chance of Flooding in Any One Year Version Notes 3.1.0 - First edition of Generation 3 models, incorporating 2019 LiDAR, ARR2019 for Hydrology and TUFLOW HPC for Hydraulic modelling. All ARIs and all aspects. (BCR 5yr, 10yr, 50yr and 2000yr runs completed by CMB). BYR and MAR no structure blockage only. MAR ARR hazard calculated using WaterRIDE. (October 2023) Version Resolution: 2.5m Data Reliability: A Indicates the flood data is of the highest available standard and has been prepared using the most recent flood model and input data Further Information: For additional information on flooding in the Moreton Bay Region please see Council's website: https://www.moretonbay.qld.gov.au/Services/Property-Ownership/Flooding Moreton Bay Regional Floodplain Database Overland Flow Flooding Version 1.25.0 (April 2025) Methodology: 'Rainfall on grid' approach applied using a hydraulic model (TUFLOW) and a nested rainfall burst. Model does not include underground structures however rainfall was scaled down to account for the possibility of some run-off being contained within the underground system. A post-process was applied to eliminate areas of shallow depth, low velocity and low velocity depth product. Additional removal of model errors and small property intersects using spatial analysis and manual techniques. Existing Conditions Scenario: Modelled estimate of the extent of overland flow paths following a 1% Annual Exceedance Probability storm outside the river and creek flood extent and with some model errors and small property intersects removed. Purpose: To determine flood extent along overland flowpaths in areas outside the extent of the river and creek flood modelling. Suitable for public dissemination. Flood Extent: Indicates the approximate extent of potential inundation during a computer-modelled flood event (not actual recorded levels). The inundation area may be less accurate where the property is flat near the outer limit of inundation, or where the ground surface has been modified since being surveyed. This dataset represents the flood extent as vector polygons without attribution. Modelled Probability: The probability of flooding represented by this dataset is: 1% Chance of Flooding in Any One Year Likelihood: Possible Annual Exceedance Probability (AEP): 1% Average Recurrence Interval (ARI): 100 Year A large uncommon flood event that is rarely observed but neverthess still possible. Over a long period of time an event of similar size may occur on average once every 100 years. It is therefore likely an event of this size will occur at least once during a single lifetime. It is less likely, but still possible, for a flood of this size to occur more than once in a single lifetime. A flood event of similar size occurred in the middle and upper reaches of the Caboolture River during January 2011. Version Notes 1.25.0 - Sub set of F01 Version 1.24 with areas removed where field Public = N in F00N Version 1.18.8 (April 2025) Version Resolution: 1.0m Data Reliability: D Indicates that Council can only provide an extent but not levels as the flood data is of limited reliability Further Information For additional information on flooding in the Moreton Bay Region please see Council's website Flood information for residents of Moreton Bay - City of Moreton Bay
readyFlood Levels 5% AEP
UpdatedNov 25, 2026Moreton Bay City Flood Database River and Creek Flooding Version 3.1.0 (October 2023) This theme shows river and creek flooding caused by long duration heavy rainfall, typically lasting between 1 hour and 1 day. Sometimes this rain falls over a whole catchment or a number of catchments. This extended period of heavy rainfall causes the water levels in the river or creek to rise and escape the main channel. It may take a number of hours or days for these floodwaters to rise, reach a peak and then subside. Existing Conditions Maximum Scenario: Maximum of modelled flood behaviour in rivers and creeks for different design rainfall events under existing climate and catchment conditions - with and without structure (bridges and culverts) blockage. Purpose: To determine flood levels and flows for different design rainfall events for design of infrastructure with and without bridges and culverts being blocked by debris. Methodology: Coupled hydrologic (WBNM) and hydraulic (TUFLOW) modelling using a two-dimensional regular grid, 1D culvert structures, 2D bridge structures and a design burst rainfall approach based on Australian Rainfall and Runoff 2019 guideline (ARR2019). Blockage calculated based on ARR2019 recommendations. Refer technical publications available from Council's website for further detail. Flood Height: Indicates the approximate water surface level of potential inundation during a computer-modelled flood event, expressed in meters above mean sea level. This dataset represents the flood height values as contour lines using a contour interval of 0.2m. Modelled Probability: The probability of flooding represented by this dataset is: 5% Chance of Flooding in Any One Year Likelihood: Likely Annual Exceedance Probability (AEP): 5% Average Recurrence Interval (ARI): 20 Year A small flood event that may be observed from time to time. Over a very long period of time an event of similar size may occur on average once every 20 years. Although unusual, an event of this size can occur more frequently. It is likely an event of this size will occur more than once during a single lifetime. The river and creek flood event that occurred in the middle reaches of Burpengary Creek during May 2009 was similar in size to this event. Version Notes 3.1.0 - First edition of Generation 3 models, incorporating 2019 LiDAR, ARR2019 for Hydrology and TUFLOW HPC for Hydraulic modelling. All ARIs and all aspects. (BCR 5yr, 10yr, 50yr and 2000yr runs completed by CMB). BYR and MAR no structure blockage only. MAR ARR hazard calculated using WaterRIDE. (October 2023) Version Resolution: 2.5m Data Reliability: A Indicates the flood data is of the highest available standard and has been prepared using the most recent flood model and input data Further Information: For additional information on flooding in the Moreton Bay Region please see Council's website: https://www.moretonbay.qld.gov.au/Services/Property-Ownership/Flooding
readyFlood Levels 1% AEP
UpdatedNov 25, 2026Moreton Bay City Flood Database River and Creek Flooding Version 3.1.0 (October 2023) This theme shows river and creek flooding caused by long duration heavy rainfall, typically lasting between 1 hour and 1 day. Sometimes this rain falls over a whole catchment or a number of catchments. This extended period of heavy rainfall causes the water levels in the river or creek to rise and escape the main channel. It may take a number of hours or days for these floodwaters to rise, reach a peak and then subside. Existing Conditions Maximum Scenario: Maximum of modelled flood behaviour in rivers and creeks for different design rainfall events under existing climate and catchment conditions - with and without structure (bridges and culverts) blockage. Purpose: To determine flood levels and flows for different design rainfall events for design of infrastructure with and without bridges and culverts being blocked by debris. Methodology: Coupled hydrologic (WBNM) and hydraulic (TUFLOW) modelling using a two-dimensional regular grid, 1D culvert structures, 2D bridge structures and a design burst rainfall approach based on Australian Rainfall and Runoff 2019 guideline (ARR2019). Blockage calculated based on ARR2019 recommendations. Refer technical publications available from Council's website for further detail. Flood Height: Indicates the approximate water surface level of potential inundation during a computer-modelled flood event, expressed in meters above mean sea level. This dataset represents the flood height values as contour lines using a contour interval of 0.2m. Modelled Probability: The probability of flooding represented by this dataset is: 1% Chance of Flooding in Any One Year Likelihood: Possible Annual Exceedance Probability (AEP): 1% Average Recurrence Interval (ARI): 100 Year A large uncommon flood event that is rarely observed but nevertheless still possible. Over a long period of time an event of similar size may occur on average once every 100 years. It is therefore likely an event of this size will occur at least once during a single lifetime. It is less likely, but still possible, for a flood of this size to occur more than once in a single lifetime. A flood event of similar size occurred in the middle and upper reaches of the Caboolture River during January 2011. Version Notes 3.1.0 - First edition of Generation 3 models, incorporating 2019 LiDAR, ARR2019 for Hydrology and TUFLOW HPC for Hydraulic modelling. All ARIs and all aspects. (BCR 5yr, 10yr, 50yr and 2000yr runs completed by CMB). BYR and MAR no structure blockage only. MAR ARR hazard calculated using WaterRIDE. (October 2023) Version Resolution: 2.5m Data Reliability: A Indicates the flood data is of the highest available standard and has been prepared using the most recent flood model and input data Further Information: For additional information on flooding in the Moreton Bay Region please see Council's website: https://www.moretonbay.qld.gov.au/Services/Property-Ownership/Flooding
readyFlood Levels 0.1% AEP
UpdatedNov 25, 2026Moreton Bay City Flood Database River and Creek Flooding Version 3.1.0 (October 2023) This theme shows river and creek flooding caused by long duration heavy rainfall, typically lasting between 1 hour and 1 day. Sometimes this rain falls over a whole catchment or a number of catchments. This extended period of heavy rainfall causes the water levels in the river or creek to rise and escape the main channel. It may take a number of hours or days for these floodwaters to rise, reach a peak and then subside. Existing Conditions Maximum Scenario: Maximum of modelled flood behaviour in rivers and creeks for different design rainfall events under existing climate and catchment conditions - with and without structure (bridges and culverts) blockage. Purpose: To determine flood levels and flows for different design rainfall events for design of infrastructure with and without bridges and culverts being blocked by debris. Methodology: Coupled hydrologic (WBNM) and hydraulic (TUFLOW) modelling using a two-dimensional regular grid, 1D culvert structures, 2D bridge structures and a design burst rainfall approach based on Australian Rainfall and Runoff 2019 guideline (ARR2019). Blockage calculated based on ARR2019 recommendations. Refer technical publications available from Council's website for further detail. Flood Height: Indicates the approximate water surface level of potential inundation during a computer-modelled flood event, expressed in meters above mean sea level. This dataset represents the flood height values as contour lines using a contour interval of 0.2m. Modelled Probability: The probability of flooding represented by this dataset is: 0.1% Chance of Flooding in Any One Year Likelihood: Unlikely Annual Exceedance Probability (AEP): 0.1% Average Recurrence Interval (ARI): 1,000 Year A very large and very unlikely flood event. Over a very long period of time an event of similar size may occur on average once every 1,000 years. Few people will ever witness an event of this size. When an event of this size is observed it is considered to be very exceptional. A river and creek flood event of similar size occurred in the middle reaches of the North Pine River during January 2011. Whilst very unlikely, it is possible for these events to occur. Version Notes 3.1.0 - First edition of Generation 3 models, incorporating 2019 LiDAR, ARR2019 for Hydrology and TUFLOW HPC for Hydraulic modelling. All ARIs and all aspects. (BCR 5yr, 10yr, 50yr and 2000yr runs completed by CMB). BYR and MAR no structure blockage only. MAR ARR hazard calculated using WaterRIDE. (October 2023) Version Resolution: 2.5m Data Reliability: A Indicates the flood data is of the highest available standard and has been prepared using the most recent flood model and input data Further Information: For additional information on flooding in the Moreton Bay Region please see Council's website: https://www.moretonbay.qld.gov.au/Services/Property-Ownership/Flooding
readyFlood Depth Classified 5% AEP
UpdatedNov 25, 2026Moreton Bay City Flood Database River and Creek Flooding Version 3.1.0 (October 2023) This theme shows river and creek flooding caused by long duration heavy rainfall, typically lasting between 1 hour and 1 day. Sometimes this rain falls over a whole catchment or a number of catchments. This extended period of heavy rainfall causes the water levels in the river or creek to rise and escape the main channel. It may take a number of hours or days for these floodwaters to rise, reach a peak and then subside. Existing Conditions Maximum Scenario: Maximum of modelled flood behaviour in rivers and creeks for different design rainfall events under existing climate and catchment conditions - with and without structure (bridges and culverts) blockage. Purpose: To determine flood levels and flows for different design rainfall events for design of infrastructure with and without bridges and culverts being blocked by debris. Methodology: Coupled hydrologic (WBNM) and hydraulic (TUFLOW) modelling using a two-dimensional regular grid, 1D culvert structures, 2D bridge structures and a design burst rainfall approach based on Australian Rainfall and Runoff 2019 guideline (ARR2019). Blockage calculated based on ARR2019 recommendations. Refer technical publications available from Council's website for further detail. Flood Depth: Indicates the approximate depth of potential inundation during a computer-modelled flood event (not actual recorded levels). This dataset represents the raw modelled depth values as a continuous grid of floating-point values. Modelled Probability: The probability of flooding represented by this dataset is: 5% Chance of Flooding in Any One Year Likelihood: Likely Annual Exceedance Probability (AEP): 5% Average Recurrence Interval (ARI): 20 Year A small flood event that may be observed from time to time. Over a very long period of time an event of similar size may occur on average once every 20 years. Although unusual, an event of this size can occur more frequently. It is likely an event of this size will occur more than once during a single lifetime. The river and creek flood event that occurred in the middle reaches of Burpengary Creek during May 2009 was similar in size to this event. Version Notes 3.1.0 - First edition of Generation 3 models, incorporating 2019 LiDAR, ARR2019 for Hydrology and TUFLOW HPC for Hydraulic modelling. All ARIs and all aspects. (BCR 5yr, 10yr, 50yr and 2000yr runs completed by CMB). BYR and MAR no structure blockage only. MAR ARR hazard calculated using WaterRIDE. (October 2023) Version Resolution: 2.5m Data Reliability: A Indicates the flood data is of the highest available standard and has been prepared using the most recent flood model and input data Further Information: For additional information on flooding in the Moreton Bay Region please see Council's website: https://www.moretonbay.qld.gov.au/Services/Property-Ownership/Flooding
readyFlood Depth Classified 20% AEP
UpdatedNov 25, 2026Moreton Bay City Flood Database River and Creek Flooding Version 3.1.0 (October 2023) This theme shows river and creek flooding caused by long duration heavy rainfall, typically lasting between 1 hour and 1 day. Sometimes this rain falls over a whole catchment or a number of catchments. This extended period of heavy rainfall causes the water levels in the river or creek to rise and escape the main channel. It may take a number of hours or days for these floodwaters to rise, reach a peak and then subside. Existing Conditions Maximum Scenario: Maximum of modelled flood behaviour in rivers and creeks for different design rainfall events under existing climate and catchment conditions - with and without structure (bridges and culverts) blockage. Purpose: To determine flood levels and flows for different design rainfall events for design of infrastructure with and without bridges and culverts being blocked by debris. Methodology: Coupled hydrologic (WBNM) and hydraulic (TUFLOW) modelling using a two-dimensional regular grid, 1D culvert structures, 2D bridge structures and a design burst rainfall approach based on Australian Rainfall and Runoff 2019 guideline (ARR2019). Blockage calculated based on ARR2019 recommendations. Refer technical publications available from Council's website for further detail. Flood Depth: Indicates the approximate depth of potential inundation during a computer-modelled flood event (not actual recorded levels). This dataset represents the raw modelled depth values as a continuous grid of floating-point values. Modelled Probability: The probability of flooding represented by this dataset is: 20% Chance of Flooding in Any One Year Likelihood: Likely Annual Exceedance Probability (AEP): 20% Average Recurrence Interval (ARI): 5 Year Version Notes 3.1.0 - First edition of Generation 3 models, incorporating 2019 LiDAR, ARR2019 for Hydrology and TUFLOW HPC for Hydraulic modelling. All ARIs and all aspects. (BCR 5yr, 10yr, 50yr and 2000yr runs completed by CMB). BYR and MAR no structure blockage only. MAR ARR hazard calculated using WaterRIDE. (October 2023) Version Resolution: 2.5m Data Reliability: A Indicates the flood data is of the highest available standard and has been prepared using the most recent flood model and input data Further Information: For additional information on flooding in the Moreton Bay Region please see Council's website: https://www.moretonbay.qld.gov.au/Services/Property-Ownership/Flooding
readyFlood Depth Classified 2% AEP
UpdatedNov 25, 2026Moreton Bay City Flood Database River and Creek Flooding Version 3.1.0 (October 2023) This theme shows river and creek flooding caused by long duration heavy rainfall, typically lasting between 1 hour and 1 day. Sometimes this rain falls over a whole catchment or a number of catchments. This extended period of heavy rainfall causes the water levels in the river or creek to rise and escape the main channel. It may take a number of hours or days for these floodwaters to rise, reach a peak and then subside. Existing Conditions Maximum Scenario: Maximum of modelled flood behaviour in rivers and creeks for different design rainfall events under existing climate and catchment conditions - with and without structure (bridges and culverts) blockage. Purpose: To determine flood levels and flows for different design rainfall events for design of infrastructure with and without bridges and culverts being blocked by debris. Methodology: Coupled hydrologic (WBNM) and hydraulic (TUFLOW) modelling using a two-dimensional regular grid, 1D culvert structures, 2D bridge structures and a design burst rainfall approach based on Australian Rainfall and Runoff 2019 guideline (ARR2019). Blockage calculated based on ARR2019 recommendations. Refer technical publications available from Council's website for further detail. Flood Depth: Indicates the approximate depth of potential inundation during a computer-modelled flood event (not actual recorded levels). This dataset represents the raw modelled depth values as a continuous grid of floating-point values. Modelled Probability: The probability of flooding represented by this dataset is: 2% Chance of Flooding in Any One Year Likelihood: Possible Annual Exceedance Probability (AEP): 2% Average Recurrence Interval (ARI): 50 Year Version Notes 3.1.0 - First edition of Generation 3 models, incorporating 2019 LiDAR, ARR2019 for Hydrology and TUFLOW HPC for Hydraulic modelling. All ARIs and all aspects. (BCR 5yr, 10yr, 50yr and 2000yr runs completed by CMB). BYR and MAR no structure blockage only. MAR ARR hazard calculated using WaterRIDE. (October 2023) Version Resolution: 2.5m Data Reliability: A Indicates the flood data is of the highest available standard and has been prepared using the most recent flood model and input data Further Information: For additional information on flooding in the Moreton Bay Region please see Council's website: https://www.moretonbay.qld.gov.au/Services/Property-Ownership/Flooding
readyFlood Depth Classified 10% AEP
UpdatedNov 25, 2026Moreton Bay City Flood Database River and Creek Flooding Version 3.1.0 (October 2023) This theme shows river and creek flooding caused by long duration heavy rainfall, typically lasting between 1 hour and 1 day. Sometimes this rain falls over a whole catchment or a number of catchments. This extended period of heavy rainfall causes the water levels in the river or creek to rise and escape the main channel. It may take a number of hours or days for these floodwaters to rise, reach a peak and then subside. Existing Conditions Maximum Scenario: Maximum of modelled flood behaviour in rivers and creeks for different design rainfall events under existing climate and catchment conditions - with and without structure (bridges and culverts) blockage. Purpose: To determine flood levels and flows for different design rainfall events for design of infrastructure with and without bridges and culverts being blocked by debris. Methodology: Coupled hydrologic (WBNM) and hydraulic (TUFLOW) modelling using a two-dimensional regular grid, 1D culvert structures, 2D bridge structures and a design burst rainfall approach based on Australian Rainfall and Runoff 2019 guideline (ARR2019). Blockage calculated based on ARR2019 recommendations. Refer technical publications available from Council's website for further detail. Flood Depth: Indicates the approximate depth of potential inundation during a computer-modelled flood event (not actual recorded levels). This dataset represents the raw modelled depth values as a continuous grid of floating-point values. Modelled Probability: The probability of flooding represented by this dataset is: 10% Chance of Flooding in Any One Year Likelihood: Likely Annual Exceedance Probability (AEP): 10% Average Recurrence Interval (ARI): 10 Year Version Notes 3.1.0 - First edition of Generation 3 models, incorporating 2019 LiDAR, ARR2019 for Hydrology and TUFLOW HPC for Hydraulic modelling. All ARIs and all aspects. (BCR 5yr, 10yr, 50yr and 2000yr runs completed by CMB). BYR and MAR no structure blockage only. MAR ARR hazard calculated using WaterRIDE. (October 2023) Version Resolution: 2.5m Data Reliability: A Indicates the flood data is of the highest available standard and has been prepared using the most recent flood model and input data Further Information: For additional information on flooding in the Moreton Bay Region please see Council's website: https://www.moretonbay.qld.gov.au/Services/Property-Ownership/Flooding
readyFlood Depth Classified 1% AEP
UpdatedNov 25, 2026Moreton Bay City Flood Database River and Creek Flooding Version 3.1.0 (October 2023) This theme shows river and creek flooding caused by long duration heavy rainfall, typically lasting between 1 hour and 1 day. Sometimes this rain falls over a whole catchment or a number of catchments. This extended period of heavy rainfall causes the water levels in the river or creek to rise and escape the main channel. It may take a number of hours or days for these floodwaters to rise, reach a peak and then subside. Existing Conditions Maximum Scenario: Maximum of modelled flood behaviour in rivers and creeks for different design rainfall events under existing climate and catchment conditions - with and without structure (bridges and culverts) blockage. Purpose: To determine flood levels and flows for different design rainfall events for design of infrastructure with and without bridges and culverts being blocked by debris. Methodology: Coupled hydrologic (WBNM) and hydraulic (TUFLOW) modelling using a two-dimensional regular grid, 1D culvert structures, 2D bridge structures and a design burst rainfall approach based on Australian Rainfall and Runoff 2019 guideline (ARR2019). Blockage calculated based on ARR2019 recommendations. Refer technical publications available from Council's website for further detail. Flood Depth: Indicates the approximate depth of potential inundation during a computer-modelled flood event (not actual recorded levels). This dataset represents the raw modelled depth values as a continuous grid of floating-point values. Modelled Probability: The probability of flooding represented by this dataset is: 1% Chance of Flooding in Any One Year Likelihood: Possible Annual Exceedance Probability (AEP): 1% Average Recurrence Interval (ARI): 100 Year A large uncommon flood event that is rarely observed but nevertheless still possible. Over a long period of time an event of similar size may occur on average once every 100 years. It is therefore likely an event of this size will occur at least once during a single lifetime. It is less likely, but still possible, for a flood of this size to occur more than once in a single lifetime. A flood event of similar size occurred in the middle and upper reaches of the Caboolture River during January 2011. Version Notes 3.1.0 - First edition of Generation 3 models, incorporating 2019 LiDAR, ARR2019 for Hydrology and TUFLOW HPC for Hydraulic modelling. All ARIs and all aspects. (BCR 5yr, 10yr, 50yr and 2000yr runs completed by CMB). BYR and MAR no structure blockage only. MAR ARR hazard calculated using WaterRIDE. (October 2023) Version Resolution: 2.5m Data Reliability: A Indicates the flood data is of the highest available standard and has been prepared using the most recent flood model and input data Further Information: For additional information on flooding in the Moreton Bay Region please see Council's website: https://www.moretonbay.qld.gov.au/Services/Property-Ownership/Flooding
readyFlood Depth Classified 0.1% AEP
UpdatedNov 25, 2026Moreton Bay City Flood Database River and Creek Flooding Version 3.1.0 (October 2023) This theme shows river and creek flooding caused by long duration heavy rainfall, typically lasting between 1 hour and 1 day. Sometimes this rain falls over a whole catchment or a number of catchments. This extended period of heavy rainfall causes the water levels in the river or creek to rise and escape the main channel. It may take a number of hours or days for these floodwaters to rise, reach a peak and then subside. Existing Conditions Maximum Scenario: Maximum of modelled flood behaviour in rivers and creeks for different design rainfall events under existing climate and catchment conditions - with and without structure (bridges and culverts) blockage. Purpose: To determine flood levels and flows for different design rainfall events for design of infrastructure with and without bridges and culverts being blocked by debris. Methodology: Coupled hydrologic (WBNM) and hydraulic (TUFLOW) modelling using a two-dimensional regular grid, 1D culvert structures, 2D bridge structures and a design burst rainfall approach based on Australian Rainfall and Runoff 2019 guideline (ARR2019). Blockage calculated based on ARR2019 recommendations. Refer technical publications available from Council's website for further detail. Flood Depth: Indicates the approximate depth of potential inundation during a computer-modelled flood event (not actual recorded levels). This dataset represents the raw modelled depth values as a continuous grid of floating-point values. Modelled Probability: The probability of flooding represented by this dataset is: 0.1% Chance of Flooding in Any One Year Likelihood: Unlikely Annual Exceedance Probability (AEP): 0.1% Average Recurrence Interval (ARI): 1,000 Year A very large and very unlikely flood event. Over a very long period of time an event of similar size may occur on average once every 1,000 years. Few people will ever witness an event of this size. When an event of this size is observed it is considered to be very exceptional. A river and creek flood event of similar size occurred in the middle reaches of the North Pine River during January 2011. Whilst very unlikely, it is possible for these events to occur. Version Notes 3.1.0 - First edition of Generation 3 models, incorporating 2019 LiDAR, ARR2019 for Hydrology and TUFLOW HPC for Hydraulic modelling. All ARIs and all aspects. (BCR 5yr, 10yr, 50yr and 2000yr runs completed by CMB). BYR and MAR no structure blockage only. MAR ARR hazard calculated using WaterRIDE. (October 2023) Version Resolution: 2.5m Data Reliability: A Indicates the flood data is of the highest available standard and has been prepared using the most recent flood model and input data Further Information: For additional information on flooding in the Moreton Bay Region please see Council's website: https://www.moretonbay.qld.gov.au/Services/Property-Ownership/Flooding
readyFlood Depth Classified 0.05% AEP
UpdatedNov 25, 2026Moreton Bay City Flood Database River and Creek Flooding Version 3.1.0 (October 2023) This theme shows river and creek flooding caused by long duration heavy rainfall, typically lasting between 1 hour and 1 day. Sometimes this rain falls over a whole catchment or a number of catchments. This extended period of heavy rainfall causes the water levels in the river or creek to rise and escape the main channel. It may take a number of hours or days for these floodwaters to rise, reach a peak and then subside. Existing Conditions Maximum Scenario: Maximum of modelled flood behaviour in rivers and creeks for different design rainfall events under existing climate and catchment conditions - with and without structure (bridges and culverts) blockage. Purpose: To determine flood levels and flows for different design rainfall events for design of infrastructure with and without bridges and culverts being blocked by debris. Methodology: Coupled hydrologic (WBNM) and hydraulic (TUFLOW) modelling using a two-dimensional regular grid, 1D culvert structures, 2D bridge structures and a design burst rainfall approach based on Australian Rainfall and Runoff 2019 guideline (ARR2019). Blockage calculated based on ARR2019 recommendations. Refer technical publications available from Council's website for further detail. Flood Depth: Indicates the approximate depth of potential inundation during a computer-modelled flood event (not actual recorded levels). This dataset represents the raw modelled depth values as a continuous grid of floating-point values. Modelled Probability: The probability of flooding represented by this dataset is: 0.05% Chance of Flooding in Any One Year Likelihood: Unlikely Annual Exceedance Probability (AEP): 0.05% Average Recurrence Interval (ARI): 2,000 Year Version Notes 3.1.0 - First edition of Generation 3 models, incorporating 2019 LiDAR, ARR2019 for Hydrology and TUFLOW HPC for Hydraulic modelling. All ARIs and all aspects. (BCR 5yr, 10yr, 50yr and 2000yr runs completed by CMB). BYR and MAR no structure blockage only. MAR ARR hazard calculated using WaterRIDE. (October 2023) Version Resolution: 2.5m Data Reliability: A Indicates the flood data is of the highest available standard and has been prepared using the most recent flood model and input data Further Information: For additional information on flooding in the Moreton Bay Region please see Council's website: https://www.moretonbay.qld.gov.au/Services/Property-Ownership/Flooding
readyDog Parks
UpdatedNov 25, 2026Version 3 Feburary 2019 A collection of the dog off leash areas and dog posts in The Moreton Bay Region. The Moreton Bay Region has a diverse range of open spaces, parks and gardens that help build a healthy, active, vibrant and connected community.
readyDog Beaches
UpdatedNov 25, 2026A layer containing beach where dogs are allowed both on and off leash in Moreton Bay.
readyCMB Bus Stops
UpdatedNov 25, 2026Current bus stops and bus stop related infrastructure in the City of Moreton Bay All stops are part of the Translink bus network as at time of map creation.
readyCMB Bookable Sites
UpdatedNov 25, 2026A layer containing the border of each bookable site location.
readyCity Of Moreton Bay Property Waste Collection Days and Recycle Weeks
UpdatedNov 25, 2026City of Moreton Bay waste collection and recycle services for properties in the City.
readyCity Of Moreton Bay Road Centreline with Elevation
UpdatedNov 25, 2026This layer supports the development of a compliant road register by providing Start and End elevation values for road segments. Elevation values were interpolated from Council’s LiDAR‑derived elevation dataset and applied to the ADAC road centreline, which offers the most consistent and representative location for level attribution. This dataset is produced as a one‑off process and is updated only on request. Road Centreline version used: 2026‑04‑13 LiDAR dataset used: 2023
readyMBRC Planning Scheme Walking Distance Train Station Overlay
UpdatedNov 25, 2026Version 29 January 2020 The Walking Distance Train Station Overlay is part of the Moreton Bay Regional Council Planning Scheme. MBRC Planning Scheme will help to respond to growth and development across the Moreton Bay Region. It is a statutory document regulating how land can be used and developed. The MBRC planning scheme replaces the three previous planning schemes created by the former Caboolture, Pine Rivers and Redcliffe councils. Planning schemes use overlays to show the location and extent of special features that need to be considered, such as where land may be subject to hazards or other characteristics. Overlay maps may apply to all or part of your property and your property may be affected by more than one overlay. Having an overlay on your property will only affect you if you intend to develop (i.e. extent or build, change use, subdivide, clear native vegetation, fill or excavate). The attribute fields are defined as per Qld Planning Provisions, Schedule 2. The Queensland Planning Provisions (QPP) are the standard planning scheme provisions made by the Minister for Planning under Chapter 2, Part 5, Division 2 and Chapter 2, Part 6 of the Sustainable Planning Act 2009.
readyMBRC Imagery 1958
UpdatedNov 25, 2026Historic Imagery Of MBRC in 1958 historic
readyCMB Planning Scheme Strategic Framework Place Types
UpdatedNov 25, 2026Version Oct 2021 The Strategic Framework Place Types is part of the Moreton Bay Regional Council Planning Scheme. MBRC Planning Scheme will help to respond to growth and development across the Moreton Bay Region. It is a statutory document regulating how land can be used and developed. The MBRC planning scheme replaces the three previous planning schemes created by the former Caboolture, Pine Rivers and Redcliffe councils.Planning schemes use overlays to show the location and extent of special features that need to be considered, such as where land may be subject to hazards or other characteristics. Overlay maps may apply to all or part of your property and your property may be affected by more than one overlay. Having an overlay on your property will only affect you if you intend to develop (i.e. extent or build, change use, subdivide, clear native vegetation, fill or excavate). For more information refer to the values and constraints criteria in the relevant code in the planning scheme, see a range of helpful information sheets or contact Council. The attribute fields are defined as per Qld Planning Provisions, Schedule 2. The Queensland Planning Provisions (QPP) are the standard planning scheme provisions made by the Minister for Planning under Chapter 2, Part 5, Division 2 and Chapter 2, Part 6 of the Sustainable Planning Act 2009. Further details on the Qld Planning Provisions can be found here.
readyCity Of Moreton Bay Property Boundaries
UpdatedNov 24, 2026The Queensland Spatial Cadastral Fabric (QSCF) is the state’s authoritative spatial representation of every current land parcel, replacing the legacy Digital Cadastral Database (DCDB).
readyMoreton Bay Regional Council Sandbag Locations (Open)
UpdatedOct 22, 2026Community sandbagging locations for the Moreton Bay Region (https://www.moretonbay.qld.gov.au/sandbags/) Sandbags will not stop flood waters entirely. However, suitable placement of correctly filled bags may reduce the amount of water that enters your property. Sandbagging is a self-help process for residents; however, the SES may be able to provide assistance to individuals physically unable to get their own sandbags due to illness, age or other incapacity. If assistance is required, the SES can be contacted on 132 500. Where possible, purchase the items needed to make your own sandbags from local hardware stores and landscape supply businesses.
readyPlanning Scheme Temporary Local Planning Instruments
UpdatedSep 17, 2026Dataset Version 17 Sept 2026: Narangba Innovation Precinct (East) TLPI No.2 of 2026 Purpose - To support new and existing high impact industry and existing special industry within the Narangba Innovation Precinct (East) and protect surrounding sensitive land uses from adverse impacts. Status - In place for up to 12 months, having effect from 27 July 2026. Further information - The TLPI suspends or otherwise affects certain parts of the MBRC Planning Scheme relating to the industry zone in the Narangba Innovation Precinct (East). More information at https://www.moretonbay.qld.gov.au/Services/Building-Development/Planning-Schemes/Narangba-Innovation-Precinct Narangba East Proposed Future Housing and Employment Area TLPI No.1 of 2026 Purpose- Further regulate development over the Narangba East Proposed Future Housing and Employment Area and Early Release Area to ensure investigation area is appropriately protected for housing and jobs until the necessary land use and infrastructure planning is completed. Status - In place for up to 24 months, having effect from 18/06/2026. Further information - at https://www.moretonbay.qld.gov.au/Services/Building-Development/Planning-Schemes/Narangba-East-Proposed-Future-Enterprise-And-Employment-Area-TLPI
readyLGIP Stormwater Network Feature Layer (Sept 2026)
UpdatedSep 14, 2026Version Effective from 11 September 2026 The Stormwater network within the Local Government Infrastructure Plan (LGIP) forms part of the CMB Planning Scheme. The LGIP identifies the local government's plans for future trunk infrastructure that are necessary to service urban development at the desired standard of service in a coordinated, efficient and financially sustainable manner. City of Moreton Bay Council Planning Scheme - www.moretonbay.qld.gov.au/Services/Building-Development/Planning-Schemes/MBRC For more information, refer Adopted Amendments-LGIP Amendment No. 2 (Effective from 11 September 2026) located in www.moretonbay.qld.gov.au/Services/Building-Development/Planning-Schemes/MBRC/Amendments
readyLGIP Active Transport Network Feature Layer (Sept 2026)
UpdatedSep 14, 2026Version Effective from 11 September 2026 The Active Transport network within the Local Government Infrastructure Plan (LGIP) forms part of the CMB Planning Scheme. The LGIP identifies the local government's plans for future trunk infrastructure that are necessary to service urban development at the desired standard of service in a coordinated, efficient and financially sustainable manner. City of Moreton Bay Council Planning Scheme - www.moretonbay.qld.gov.au/Services/Building-Development/Planning-Schemes/MBRC For more information, refer Adopted Amendments-LGIP Amendment No. 2 (Effective from 11 September 2026) located in www.moretonbay.qld.gov.au/Services/Building-Development/Planning-Schemes/MBRC/Amendments
readyLGIP Public Parks and Land for Community Facilities Feature Layer (Sept 2026)
UpdatedSep 14, 2026Version Effective from 11 September 2026 The Public Parks and Land for Community Facilities network within the Local Government Infrastructure Plan (LGIP) forms part of the CMB Planning Scheme. The LGIP identifies the local government's plans for future trunk infrastructure that are necessary to service urban development at the desired standard of service in a coordinated, efficient and financially sustainable manner. City of Moreton Bay Council Planning Scheme - www.moretonbay.qld.gov.au/Services/Building-Development/Planning-Schemes/MBRC For more information, refer Adopted Amendments-LGIP Amendment No. 2 (Effective from 11 September 2026) located in www.moretonbay.qld.gov.au/Services/Building-Development/Planning-Schemes/MBRC/Amendments
readyLGIP Transport Network Feature Layer (Sept 2026)
UpdatedSep 14, 2026Version Effective from 11 September 2026 The Transport network within the Local Government Infrastructure Plan (LGIP) forms part of the CMB Planning Scheme. The LGIP identifies the local government's plans for future trunk infrastructure that are necessary to service urban development at the desired standard of service in a coordinated, efficient and financially sustainable manner. City of Moreton Bay Council Planning Scheme - www.moretonbay.qld.gov.au/Services/Building-Development/Planning-Schemes/MBRC For more information, refer Adopted Amendments-LGIP Amendment No. 2 (Effective from 11 September 2026) located in www.moretonbay.qld.gov.au/Services/Building-Development/Planning-Schemes/MBRC/Amendments
readyLGIP Priority Infrastructure Areas Feature Layer (Sept 2026)
UpdatedSep 14, 2026Version Effective from 11 September 2026 The Priority Infrastructure Areas within the Local Government Infrastructure Plan (LGIP) form part of the CMB Planning Scheme. The LGIP identifies the local government's plans for future trunk infrastructure that are necessary to service urban development at the desired standard of service in a coordinated, efficient and financially sustainable manner. City of Moreton Bay Council Planning Scheme - www.moretonbay.qld.gov.au/Services/Building-Development/Planning-Schemes/MBRC For more information, refer Adopted Amendments-LGIP Amendment No. 2 (Effective from 11 September 2026) located in www.moretonbay.qld.gov.au/Services/Building-Development/Planning-Schemes/MBRC/Amendments
readyLGIP Projection Areas Feature Layer (Sept 2026)
UpdatedSep 14, 2026Version Effective from 11 September 2026 The Projection Areas within the Local Government Infrastructure Plan (LGIP) form part of the CMB Planning Scheme. The LGIP identifies the local government's plans for future trunk infrastructure that are necessary to service urban development at the desired standard of service in a coordinated, efficient and financially sustainable manner. City of Moreton Bay Council Planning Scheme - www.moretonbay.qld.gov.au/Services/Building-Development/Planning-Schemes/MBRC For more information, refer Adopted Amendments-LGIP Amendment No. 2 (Effective from 11 September 2026) located in www.moretonbay.qld.gov.au/Services/Building-Development/Planning-Schemes/MBRC/Amendments
readyMBRC Planning Scheme Zones
UpdatedJun 29, 2026Oct 2024 Minor Amendment No.3 (Zone Map Dataset 1 of 5, needs to be used in conjunction with Local plan boundary, Local plan precincts, Zone precincts and North Lakes Locality datasets). The Zoning Map is part of the Moreton Bay Regional Council Planning Scheme. MBRC Planning Scheme will help to respond to growth and development across the Moreton Bay Region. It is a statutory document regulating how land can be used and developed. The MBRC planning scheme replaces the three previous planning schemes created by the former Caboolture, Pine Rivers and Redcliffe councils. Planning schemes use zones and overlays to show the location and extent of special features that need to be considered, such as where land may be subject to hazards or other characteristics. Overlay maps may apply to all or part of your property and your property may be affected by more than one overlay. Having an overlay on your property will only affect you if you intend to develop (i.e. extent or build, change use, subdivide, clear native vegetation, fill or excavate). The attribute fields are defined as per Qld Planning Provisions, Schedule 2. The Queensland Planning Provisions (QPP) are the standard planning scheme provisions made by the Minister for Planning under Chapter 2, Part 5, Division 2 and Chapter 2, Part 6 of the Sustainable Planning Act 2009.
readyESRI Community Basemap data @ City Of Moreton Bay
UpdatedJun 15, 2026This vector tile layer provides a customized world basemap that is uniquely symbolized. It is optimized to display special areas of interest (AOIs) that have been created and edited by Community Maps contributors. These special areas of interest include landscaping features such as grass, trees, and rock and sports amenities like tennis courts, football and baseball field lines, and more. This vector tile layer is built using the same data sources used for the World Topographic Map and other Esri basemaps.
readyDevelopment Applications
UpdatedMay 25, 2026Development Applications deemed properly made since the inception of the Moreton Bay Regional Council Planning Scheme - 1 February 2016. This information can be viewed in the 'My Street' and 'Development Explorer' applications at datahub.moretonbay.qld.gov.au/ Data is updated weekly.
ready
All endpoints loaded (104 total)