Black Earth Creek Watershed Green Infrastructure Planning
Black Earth Creek Watershed Green Infrastructure Planning is a public ArcGIS Hub or REST source for Dane County maintained by Silvernail Studio for Geodesign. It exposes 22 service-backed datasets with Queryable ArcGIS FeatureServer and MapServer records exposed through layer endpoints for discovery, preview, and connection workflows.
Public data
About this public data
Black Earth Creek Watershed Green Infrastructure Planning is a public data source published by Silvernail Studio for Geodesign for Dane County, Wisconsin, United States. It is listed in Open data sources and made available under OGL, with the latest catalogue update recorded on May 18, 2026.
This catalogue entry connects 22 public source references, preview assets, or live views so teams can evaluate the data before adding it to a workspace.
- Provider:Silvernail Studio for Geodesign
- Category:Open data sources
- Geography:Dane County, Wisconsin, United States
- Sources:22
Black Earth Creek Watershed
UpdatedJan 26, 2026Includes subwatershed boundaries and names.
readyTechnical Committee Direction form
UpdatedMar 14, 2025readyInundation BECW
UpdatedNov 18, 2022Inundation polygons by Village (Cross Plains, Black Earth, Mazomanie), mapped by Town and Country Engineering
readyFLD HZ BECW
UpdatedNov 10, 2022100, 500 year floodplains and floodways of Black Earth Creek Watershed
readyAug2018DroneImages BECW
UpdatedNov 10, 2022Image points and url's from Aug 21-27
readyBECW Green Infrastructure Design Project Feature Service
UpdatedJul 6, 2022Applies green urban stormwater infrastructure template by K.Wandsnider for Green Bay neighborhood to Black Earth Creek Watershed.
readyFlow Reduction Results HEC RAS WFL1
UpdatedApr 19, 2022Comparison of modeled 100-year floodplain at full flow, versus modeled 100-year floodplain with 10% reduction from green infrastructure practices.
readyModified Stream Reaches
UpdatedJan 19, 2022Modified stream channels from WDNR 24K Hydro streams and rivers layer. Analysis by Nick Hayden, EOR ot add and populate the "straighten" and "unnamed" attributes.
readyBEC WBD
UpdatedJan 19, 2022priority potentially restorable wetlands from Wetlands by Design
readyStakeholder Scenario
UpdatedDec 15, 2021A blank scenario to post on Hub, on which stakeholders can draw features in locations they think would be good for green infrastructure.
readyFloodHazard Imperv
UpdatedNov 15, 2021Modeled flood hazards with impervious areas for Black Earth Creek Watershed.
readyFloodHazard noImperv
UpdatedNov 15, 2021Modeled flood hazards with no impervious areas for Black Earth Creek Watershed, converted from raster.tif
readyWhere in the Watershed Results
UpdatedMay 6, 2021readyHub Events (public)
UpdatedApr 29, 2021Feature service generated by Hub for public Hub events. DO NOT DELETE THIS SERVICE. It stores the public Hub events for your organization.
readyHalfway Prairie Creek Land Use 2000
UpdatedOct 18, 2020readyUpper Black Earth Creek Land Use 2015
UpdatedOct 18, 2020readyMiddle Black Earth Creek Land Use 2015
UpdatedOct 18, 2020readyHalfway Prairie Creek Land Use 2015
UpdatedOct 18, 2020readyLower Black Earth Creek Land Use 2015
UpdatedOct 18, 2020readyUpper Black Earth Creek Land Use 2000
UpdatedOct 18, 2020readyMiddle Black Earth Creek Land Use 2000
UpdatedOct 18, 2020readyLower Black Earth Creek Land Use 2000
UpdatedOct 18, 2020ready
All endpoints loaded (22 total)